Skip Nav Destination
Close Modal
Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-6 of 6
Ali Mohammad Mirzaee
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Reimagining claim management in abandoned project closeouts: a theory of learned imperfections-as-practice
Available to Purchase
Engineering, Construction and Architectural Management 1–19.
Published: 14 January 2026
Journal Articles
A framework for utilizing “social responsibility” behaviors in resolving conflicts arising in megaprojects
Available to Purchase
Engineering, Construction and Architectural Management 1–22.
Published: 17 November 2025
Journal Articles
Utilizing multiple intelligences as a means to improving claim performance outcomes in project-based organizations
Available to Purchase
Engineering, Construction and Architectural Management (2026) 33 (1): 532–551.
Published: 11 November 2024
Journal Articles
Improving project management “closeout” phase outcomes: evidence from a large general contractor in Iran using “X-inefficiency theory”
Available to Purchase
Engineering, Construction and Architectural Management (2025) 32 (8): 5253–5271.
Published: 24 May 2024
Journal Articles
Dispute root causes and prevention in Iranian public-private partnership projects: a causal-predictive model
Available to PurchaseAli Mohammad Mirzaee, Towhid Pourrostam, Javad Majrouhi Sardroud, M. Reza Hosseini, Payam Rahnamayiezekavat, David Edwards
Engineering, Construction and Architectural Management (2024) 31 (1): 405–431.
Published: 16 September 2022
Journal Articles
Mitigation of contractual breaches in international construction joint ventures under conditions of absent legal recourse: case studies from Iran
Available to Purchase
Engineering, Construction and Architectural Management (2023) 30 (4): 1481–1495.
Published: 21 January 2022
