Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-8 of 8
Keywords: Consultants
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Cost-related compensation events under the conditions of contracts of the Public Procurement (Amendment) Act, 2016 (Act 914) for construction works in Ghana
Available to PurchaseJames Tito Ako-Adjei, Tahiru Alhassan, Daniel Donyinah, Emmanuel Nsiah Ankomah, Eric Kwaku Asare, Joseph Asante
Engineering, Construction and Architectural Management 1–19.
Published: 13 April 2026
...James Tito Ako-Adjei; Tahiru Alhassan; Daniel Donyinah; Emmanuel Nsiah Ankomah; Eric Kwaku Asare; Joseph Asante Purpose The study aimed to identify and assess cost-related compensation events from the perspective of consultants, clients, and contractors. It measured the views of the tripartite...
Journal Articles
Determinants for effective performance of external project management consultants in Malaysia
Available to Purchase
Engineering, Construction and Architectural Management (2007) 14 (5): 463–478.
Published: 11 September 2007
...Pollaphat Nitithamyong; Zijin Tan Purpose The use of external project management consulting firms (PMCs) in construction projects has not been widely accepted by practitioners in Malaysia because of several failed experiences in public projects. This study aims to investigate the important roles...
Journal Articles
Performance of engineering consultants in ISO 9000‐based quality management systems implementation
Available to Purchase
Engineering, Construction and Architectural Management (2005) 12 (6): 519–532.
Published: 01 December 2005
...S. Thomas Ng Purpose As many construction clients now require their consultants to seek accreditation under ISO 9000:2000, demonstrating customer satisfaction and continual improvement as required by the latest standards will become an important aspect for consultant practices. However...
Journal Articles
Balancing fee and quality in two envelope fee bidding
Available to Purchase
Engineering, Construction and Architectural Management (2004) 11 (3): 159–175.
Published: 01 June 2004
...Derek S. Drew; Sandy L.Y. Tang; Christine K. Lui Consultant commissions in two envelope fee bidding are awarded on the basis of fee and quality (i.e. technical score). Consultants' fees and technical score are combined using a pre‐designated formulation and predetermined weightings to form a total...
Journal Articles
Evaluating engineering consultants' general capabilities during the pre‐selection process – a Hong Kong study
Available to Purchase
Engineering, Construction and Architectural Management (2004) 11 (3): 150–158.
Published: 01 June 2004
...S. Thomas Ng; Lai‐Kit Chow Consultant pre‐selection is an essential process to distinguish capable candidates before they are invited to submit their technical and fee proposals for consultancy assignments. Despite that, many clients have their own criteria and emphasis, and this could result...
Journal Articles
Knowledge management in consulting engineering – joining IT and human resources to support the production of knowledge
Available to Purchase
Engineering, Construction and Architectural Management (2003) 10 (6): 391–401.
Published: 01 December 2003
... and too little focus on dynamics in knowledge producing processes. In contrast, the medium sized company is experimenting with soft tools used directly in the processes of the customer‐oriented projects. © MCB UP Limited 2003 Knowledge management Consultants Human resource management...
Journal Articles
The relationship between construction project management theory and transaction cost economics
Available to Purchase
Engineering, Construction and Architectural Management (1999) 6 (2): 166–176.
Published: 01 February 1999
... approaches in explaining the structuring and management of project organizations on behalf of clients and to explain the benefits of combining these approaches in furthering construction project management theory. © MCB UP Limited 1999 Clients Consultants Contractors Project management theory...
Journal Articles
An evaluation of clients' needs and responsibilities in the construction process
Available to Purchase
Engineering, Construction and Architectural Management (1995) 2 (1): 57–76.
Published: 01 January 1995
...SIMON T. KOMETA; PAUL O. OLOMOLAIYE; FRANK C. HARRIS The importance of clients' responsibilities in the construction process, as perceived by both clients and consultants, was assessed through a structured questionnaire survey. Using the relative index ranking technique, clients' fundamental needs...
