Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-4 of 4
Keywords: Contract law
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Engineering, Construction and Architectural Management (2025) 32 (8): 5253–5271.
Published: 24 May 2024
...Ali Mohammad Mirzaee; Igor Martek Purpose Optimal clean-up procedures lie at the heart of the closeout phase of construction projects under contract law. However, due to its complexity involving multiple issues, potentially unfulfilled contractual obligations, performance claims and counter-claims...
Journal Articles
Engineering, Construction and Architectural Management (2016) 23 (5): 610–621.
Published: 19 September 2016
... 17 11 2015 26 01 2016 © Emerald Group Publishing Limited 2016 Emerald Group Publishing Limited Licensed re-use rights only Malaysia Risk Information Contracts Disputes Contract law Clause 11.0 of PAM 2006 was selected as the example for the restructured contract...
Journal Articles
Engineering, Construction and Architectural Management (2008) 15 (3): 246–259.
Published: 02 May 2008
... the claims practices of contractors to gain a deeper insight regarding the nature of claims in the industry. Amr A.G. Hassanein can be contacted at: mail@finbi.com © Emerald Group Publishing Limited 2008 Construction industry Contract law Performance contracts Laws and legislation Egypt...
Journal Articles
Engineering, Construction and Architectural Management (2006) 13 (1): 96–113.
Published: 01 January 2006
... costs, a loss of profit for the extended period, site and general overheads, an extended attendance on the nominated subcontractors, extra winter costs, extra costs on preliminaries, variations, and acceleration costs. © Emerald Group Publishing Limited 2006 Contract law Contract costs...
