Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-9 of 9
Keywords: Costs
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Improving the performance profile of energy conservation measures at the Penn State University Park Campus
Available to Purchase
Engineering, Construction and Architectural Management (2017) 24 (4): 610–628.
Published: 17 July 2017
...Melissa Kazemi Rad; David Riley; Somayeh Asadi; Parhum Delgoshaei Purpose The purpose of this paper is to examine significant steps taken by the Pennsylvania State University (Penn State) to account for both energy cost savings and greenhouse gas (GHG) emissions reduction goals through strategic...
Journal Articles
Aggregation of factors causing cost overruns and time delays in large public construction projects: Trends and implications
Available to Purchase
Engineering, Construction and Architectural Management (2017) 24 (3): 393–406.
Published: 15 May 2017
...Abderisak Adam; Per-Erik Bertil Josephson; Göran Lindahl Purpose The purpose of this paper is to explore the impact that cost overruns and time delays exert on large public construction projects to clarify how past and current research regard factors causing cost overruns and time delays in large...
Journal Articles
Neural network cost estimating model for utility rehabilitation projects
Available to Purchase
Engineering, Construction and Architectural Management (2013) 20 (2): 118–126.
Published: 22 February 2013
...Tariq Shehab; Mohamad Farooq Purpose The purpose of this paper is to present an artificial intelligent (AI) system for estimating the construction cost of water and sewer rehabilitation projects. Design/methodology/approach To develop the proposed system, data pertaining to 54 sewer and water...
Journal Articles
Dispute causation: identification of pathogenic influences in construction
Available to Purchase
Engineering, Construction and Architectural Management (2010) 17 (4): 404–423.
Published: 06 July 2010
...Peter Love; Peter Davis; Joanne Ellis; Sai On Cheung Purpose While a considerable amount of knowledge has been accumulated about dispute causation, disputes continue to prevail and disharmonise the process of construction with considerable cost. This paper seeks to identify the underlying...
Journal Articles
Improving inter‐spatial comparison of construction costs
Available to Purchase
Engineering, Construction and Architectural Management (2006) 13 (2): 123–135.
Published: 01 March 2006
...Kenneth D. Walsh; Anil Sawhney; Michelle A. Vachris Purpose The purpose of this paper is to compare construction costs between nations, which is an important part of international economic statistics. Methods employed for these comparisons to date have yielded questionable results. The paper...
Journal Articles
Bidding ratios to predict highway project costs
Available to Purchase
Engineering, Construction and Architectural Management (2005) 12 (1): 38–51.
Published: 01 February 2005
...Trefor P. Williams Purpose Ratios were constructed using bidding data for highway construction projects in Texas to study whether there are useful patterns in project bids that are indicators of the project completion cost. The use of the ratios to improve predictions of completed project cost...
Journal Articles
Determinants of rework in building construction projects
Available to Purchase
Engineering, Construction and Architectural Management (2004) 11 (4): 259–274.
Published: 01 August 2004
...Peter E.D. Love; David J. Edwards Rework represents the unnecessary effort of redoing a process or activity that is incorrectly implemented the first time. Using a structured questionnaire survey, the causes and costs of rework in 161 Australian construction projects were identified. Respondents...
Journal Articles
Downtime model development for construction equipment management
Available to Purchase
Engineering, Construction and Architectural Management (2004) 11 (3): 199–210.
Published: 01 June 2004
... is explored in terms of its duration and cost. The research findings highlight how various factors and processes interact with each other to create DT, and mitigate or exacerbate its impact on project performance. It is suggested that construction companies need to adopt proactive equipment management...
Journal Articles
Impact of construction materials on project time and cost in Kuwait
Available to Purchase
Engineering, Construction and Architectural Management (2004) 11 (2): 126–132.
Published: 01 April 2004
...Parviz A. Koushki; Nabil Kartam The construction of residential projects constitutes a major portion of the building activities in the State of Kuwait. This paper presents the findings of a research project, which aims to determine the causes of delays and cost‐overruns in the construction...
