The construction of residential projects constitutes a major portion of the building activities in the State of Kuwait. This paper presents the findings of a research project, which aims to determine the causes of delays and cost‐overruns in the construction of housing projects in Kuwait. The owners of 450 residential projects (just completed or near completion), spread over 27 systematic‐randomly selected metropolitan districts, were personally interviewed. Data on owners' socio‐demographic traits and project characteristics, including those involving time and cost overruns, were obtained. The paper highlights the impacts of construction materials on time‐delays and cost‐increases. Project‐related variables affecting the on‐time delivery of materials to the construction site are examined and quantified. The material selection‐time, type of materials, their availability in the local market and the presence of a supervising engineer, all demonstrated a statistically significant impact on the on‐time delivery of materials to construction sites.
Article navigation
1 April 2004
Research Article|
April 01 2004
Impact of construction materials on project time and cost in Kuwait
Parviz A. Koushki;
Parviz A. Koushki
Department of Civil Engineering, Kuwait University, Kuwait
Search for other works by this author on:
Nabil Kartam
Nabil Kartam
Department of Civil Engineering, Kuwait University, Kuwait
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1365-232X
Print ISSN: 0969-9988
© Emerald Group Publishing Limited
2004
Engineering, Construction and Architectural Management (2004) 11 (2): 126–132.
Citation
Koushki PA, Kartam N (2004), "Impact of construction materials on project time and cost in Kuwait". Engineering, Construction and Architectural Management, Vol. 11 No. 2 pp. 126–132, doi: https://doi.org/10.1108/09699980410527867
Download citation file:
New and popular articles
Suggested Reading
Critical path determination by incorporating minimum and maximum time and distance constraints into linear scheduling
Engineering, Construction and Architectural Management (June,2004)
Factors affecting affordable housing cost in Saudi Arabia
International Journal of Housing Markets and Analysis (October,2010)
Modelling customer perceived service quality in housing construction
Engineering, Construction and Architectural Management (September,2008)
Making a case for offsite construction in China
Engineering, Construction and Architectural Management (November,2010)
Operational factors affecting strategic partnering in UK social housing
Engineering, Construction and Architectural Management (July,2007)
Related Chapters
Chapter 4 Multigroup Segregation Patterns and Determinants: The Case of Immigrants in an Italian City
Inequality, Mobility and Segregation: Essays in Honor of Jacques Silber
Social Entrepreneurship: A Quick View of the Basics
Innovation and Entrepreneurship: A New Mindset for Emerging Markets
A Consumer Vulnerability Perspective on Eviction
The Vulnerable Consumer: Beyond the Poor and the Elderly
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.