Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-2 of 2
Keywords: Indicator system
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
A multi-attribute group decision-making framework for site selection of waste-to-energy project considering public participation
Available to Purchase
Engineering, Construction and Architectural Management (2025) 32 (12): 8326–8359.
Published: 22 October 2024
... to enhance public satisfaction and ensure project success. Design/methodology/approach Firstly, based on consideration of public demand, a WtE project site selection decision indicator system was constructed from five dimensions: natural, economic, social, environmental and other supporting conditions...
Journal Articles
What's wrong with the public participation of urban regeneration project in China: a study from multiple stakeholders' perspectives
Available to Purchase
Engineering, Construction and Architectural Management (2022) 29 (1): 91–109.
Published: 01 February 2021
.... Specifically, an indicator system consisting of 12 indicators from three categories was first purposed. A perception difference-based method that integrates ANOVA test and Tukey test were then developed. The method was validated using five represented projects, and the results are interpreted based...
