Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-6 of 6
Keywords: New engineering contract
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Engineering, Construction and Architectural Management (2019) 26 (10): 2389–2409.
Published: 31 July 2019
...Chung Him Lau; Jayantha Wadu Mesthrige; Patrick T.I. Lam; Arshad Ali Javed Purpose Project delays and cost over-runs are few common major problems arising from conventional contracts. To overcome these issues, the Hong Kong Government has been practicing the use of the New Engineering Contract...
Journal Articles
Engineering, Construction and Architectural Management (1995) 2 (4): 317–326.
Published: 01 April 1995
...PHILLIP N. CAPPER Disputes under the New Engineering Contract (NEC) 2nd Edition involve a new approach to the role of Adjudicator. Clauses 90–93 have been radically revised. They reflect the recommendations of Latham's Report Constructing the Team, and growing international practice (e.g...
Journal Articles
Engineering, Construction and Architectural Management (1995) 2 (4): 307–315.
Published: 01 April 1995
...JOHN HALLIDAY The introduction of the New Engineering Contract (NEC) in the United Kingdom came at a time when the Royal Hong Kong Jockey Club were embarking on major contract works. This new contract provided the type of simple, flexible document ideal for our organization, which seeks to enter...
Journal Articles
Engineering, Construction and Architectural Management (1995) 2 (4): 287–305.
Published: 01 April 1995
...JOHN ROOKE; DAVID SEYMOUR This paper describes some current research into the impact of the New Engineering Contract (NEC) on the culture of the industry. The intention is to explain the purpose of this research, describe the methodology used and report on some early findings. In the early sections...
Journal Articles
Engineering, Construction and Architectural Management (1995) 2 (4): 249–269.
Published: 01 April 1995
...ANDREW BAIRD This paper explains why Eskom, a large electrical utility, has decided to adopt the New Engineering Contract system of documents and assist the owners of the NEC with its further development. It describes the effect this decision is having on Eskom's ‘culture’, the benefits...
Journal Articles
Engineering, Construction and Architectural Management (1995) 2 (4): 271–285.
Published: 01 April 1995
...JON C. BROOME; JOHN G. PERRY This paper examines the early experiences of the use of the New Engineering Contract (NEC) based on research at the University of Birmingham. It starts with a brief description of the research methodology before giving an overview of the extent of use of NEC, both...
