Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-11 of 11
Keywords: Performance measures
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Engineering, Construction and Architectural Management (2024) 31 (12): 4754–4790.
Published: 19 June 2023
.... However, existing studies fall short of adequately providing a mutually acceptable benchmark for assessing the performance of ICJVs. This study aims to develop an adequate and suitable performance measurement framework for ICJVs. Design/methodology/approach A twofold structured questionnaire survey...
Journal Articles
Engineering, Construction and Architectural Management (2023) 30 (6): 2280–2303.
Published: 01 March 2022
... the contributions of the relatively few empirical studies in ICJVs is difficult due to the variations and weakness of prior measures of ICJV performance. In this study, MC mechanisms have been mapped to multiple performance measures (see Figure 1). It is hypothesized that each of the MC mechanisms positively...
Journal Articles
Mershack Opoku Tetteh, Albert P.C. Chan, Ernest Effah Ameyaw, Amos Darko, Sitsofe Kwame Yevu, Emmanuel B. Boateng
Engineering, Construction and Architectural Management (2022) 29 (2): 755–781.
Published: 26 March 2021
... be contacted at: mershack-opoku.tetteh@connect.polyu.hk Construction management International joint venture International construction joint venture Management control Performance measures International joint ventures (IJVs) are a hybrid collaborative form considered as an efficient entry...
Journal Articles
Engineering, Construction and Architectural Management (2017) 24 (1): 154–169.
Published: 16 January 2017
... a refurbishment project’s performance, the designers need to have knowledge, enthusiasm, commitment and coordination skills. Yin et al. (2011) developed a design performance measurement (DPM) matrix to measure collaboration between design project team members. Their results indicated that decision...
Journal Articles
Engineering, Construction and Architectural Management (2016) 23 (5): 588–609.
Published: 19 September 2016
... reviewed the method of performance measurement and improvement so as to enhance its productivity. The review of performance in the industry created competition, value for money and above all increased productivity. This was relevant because timely review and re-measurement of performance leads...
Journal Articles
Engineering, Construction and Architectural Management (2013) 20 (1): 7–28.
Published: 04 January 2013
... assessment Performance measures Research quality United Kingdom Performance management The assessment of the research performance of universities by government is a routine feature of many university systems throughout the world. Previous papers by Lansley (1999, 2007) have reviewed...
Journal Articles
Engineering, Construction and Architectural Management (2011) 18 (1): 30–49.
Published: 11 January 2011
.... Neither do lagging measures assist in identifying the causes of incidents, reducing their usefulness in the diagnosis of OHS problems. Health and safety Measurement characteristics Performance measures Construction industry Australia The measurement of performance is a critical...
Journal Articles
Engineering, Construction and Architectural Management (2010) 17 (1): 35–45.
Published: 12 January 2010
... is also captured herein. From the interviews with the customer organizations, several interesting elements have come to the fore in terms of what excellent performance from their first‐tier contractors looks like. The interviews revealed that many of the traditional performance measures...
Journal Articles
Engineering, Construction and Architectural Management (2009) 16 (6): 612–632.
Published: 06 November 2009
... Construction industry Safety Employee participation Performance measures A total of 77 construction workers and four members of the public died from construction accidents in the UK in 2006/2007 according to the Health and Safety Executive (HSE, 2008), an increase of 28 per cent on the previous year...
Journal Articles
Engineering, Construction and Architectural Management (2009) 16 (4): 353–375.
Published: 03 July 2009
...; and volunteering to help works contractors solve personal problems. D.K. Ahadzie can be contacted at: divinedka10@yahoo.com © Emerald Group Publishing Limited 2009 Competences Project management Housing Ghana Performance measures Training Acquiring the core competencies contingent...
Journal Articles
Engineering, Construction and Architectural Management (2007) 14 (1): 7–25.
Published: 16 January 2007
... be helpful; first, testing what might be viewed as truisms about the RAE; second, systematically identifying issues for those compiling future RAE submissions; and, third, stimulating debate about the conduct of RAEs. Research Performance measures Quality assessment Universities United Kingdom...
