Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-8 of 8
Keywords: Qualitative comparative analysis
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Investigating the feasible configurational paths in selecting project delivery method between design-bid-build and design-build
Available to Purchase
Engineering, Construction and Architectural Management 1–25.
Published: 25 November 2025
.... To address this, this study employed qualitative comparative analysis (QCA) to investigate the configurational impact of critical criteria affecting the selection between design-bid-build (DBB) and design-build (DB). Design/methodology/approach Collecting data from 20 DBB cases and 20 DB cases in China...
Journal Articles
Multiple paths to enhancing total factor productivity in the construction industry from the configuration perspective: evidence from China
Available to Purchase
Engineering, Construction and Architectural Management 1–24.
Published: 25 August 2025
... the institutional environment and organizational resources affects the TFP of the construction industry. This model is informed by the resource-based view and institutional theory. To test the proposed model, Necessary Condition Analysis (NCA) and Qualitative Comparative Analysis (QCA) were employed, utilizing case...
Journal Articles
Untangling innovation diffusion in construction projects: a configural analysis of project attribute and corporate strategy
Available to Purchase
Engineering, Construction and Architectural Management (2026) 33 (6): 4523–4542.
Published: 08 April 2025
.../methodology/approach A fuzzy set qualitative comparative analysis was adopted to examine all associated configurations by collecting 229 questionnaires from construction projects. Findings Innovations driven by corporate strategies were more likely to diffuse to become a firm-level mainstream product...
Includes: Supplementary data
Journal Articles
How do public owners’ dynamic capabilities improve project resilience in megaprojects: a configurational perspective
Available to Purchase
Engineering, Construction and Architectural Management (2026) 33 (5): 3799–3819.
Published: 25 February 2025
... resilience in megaprojects along with different organizational learning mechanisms and learning orientations. Based on 330 ODC events in 19 construction megaprojects, a multi-temporal crisp-set qualitative comparative analysis method is adopted to extract configurations of ODCs for project resilience...
Journal Articles
Coopetition configuration and performance of international joint ventures for high-speed rail projects
Available to Purchase
Engineering, Construction and Architectural Management (2024) 31 (9): 3748–3772.
Published: 16 February 2023
... operationalized, which were validated by expert interviews. Then the information on 12 HSR IJVs was collected and quantified through nine rounds of interviews and a questionnaire survey. Later, the fuzzy-set qualitative comparative analysis (fsQCA) was applied to explore what coopetition configurations benefit...
Journal Articles
Organizational antecedents and multiple paths of knowledge-sharing behavior of construction project members: evidence from Chinese construction enterprises
Available to Purchase
Engineering, Construction and Architectural Management (2024) 31 (3): 957–975.
Published: 12 October 2022
... associated with KSB from organizational culture and structure were identified. Subsequently, the authors used survey data from 152 organization members in Chinese construction enterprises to conduct the fuzzy-set qualitative comparative analysis (fsQCA) and reveal configurations of organizational antecedents...
Journal Articles
Engineering, Construction and Architectural Management (2023) 30 (7): 2794–2813.
Published: 15 April 2022
...Linlin Xie; Ting Xu; Tianhao Ju; Bo Xia Purpose The alienation of megaproject environmental responsibility (MER) behavior is destructive, but its mechanism has not been clearly depicted. Based on fraud triangle theory and the fuzzy set qualitative comparative analysis (fsQCA) method, this study...
Journal Articles
Influencing factors of construction professionals’ burnout in China: a sequential mixed-method approach
Available to Purchase
Engineering, Construction and Architectural Management (2020) 27 (10): 3215–3233.
Published: 10 June 2020
... for this research. Twenty-two interviews were conducted and analysed, and we identified ten influencing factors associated with CPs’ burnout. Subsequently, a sample of 232 questionnaires was analysed using fuzzy-set qualitative comparative analysis (fsQCA) to ascertain the eight configurations of CPs’ high and low...
