Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-15 of 15
Keywords: Quality
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Engineering, Construction and Architectural Management (2023) 30 (9): 4415–4434.
Published: 20 June 2022
... for clients and contractors. Originality/value The use of the framework in proactive assessment and management of MSRB can lead to effective strategies for construction enterprises to increase the efficiency and quality of projects. © Emerald Publishing Limited 2022 Emerald Publishing Limited...
Journal Articles
Engineering, Construction and Architectural Management (2023) 30 (9): 4018–4044.
Published: 17 May 2022
... of its inter-relationships by disentangling their effects on operational performance. Accordingly, this paper aims to identify and assess the inter-dependencies of the risks in the RLSC to improve quality-related operational performance. Design/methodology/approach A sequential exploratory mixed...
Journal Articles
Engineering, Construction and Architectural Management (2017) 24 (6): 988–1003.
Published: 20 November 2017
...Saad Abdel-Karim El-Hamrawy; Ahmed Ebrahim Abu El-Maaty; Ahmed Yousry Akal Purpose Quality measurement is the trigger for quality improvement. Indeed, what gets measured gets done. The real scope of quality improvement in construction projects is the difficulty and-maybe-lack of quality...
Journal Articles
Engineering, Construction and Architectural Management (2011) 18 (2): 127–139.
Published: 01 March 2011
... quality, and at times go bankrupt. Construction industry Quality Skills Training Tanzania Generally, construction activities make use of three main resources, namely materials, equipment and/or plant and labour. Of all, labour is particularly concerned with the use of other two...
Journal Articles
Engineering, Construction and Architectural Management (2009) 16 (1): 8–25.
Published: 09 January 2009
...Imriyas Kamardeen Purpose The construction industry in Singapore has been recording higher accident rates compared with other industries. As an initiative to reduce occupational accidents, the Building and Construction Authority of Singapore proposed to clients to adopt quality‐fee method (QFM...
Journal Articles
Engineering, Construction and Architectural Management (2008) 15 (1): 21–41.
Published: 11 January 2008
... The methodology of evaluation was based on similar evaluations of total quality management frameworks and excellence models in the literature. The developed model was measured via a questionnaire survey. The questionnaire as a measuring instrument was evaluated in terms of reliability and validity using...
Journal Articles
Engineering, Construction and Architectural Management (2006) 13 (3): 307–318.
Published: 01 May 2006
... balanced approach to the assessment of construction quality by ensuring THAT consumer expectations are taken into account, as well as the normal emphasis on technical quality standards. Perry Forsythe can be contacted at: P.Forsythe@unsw.edu.au © Emerald Group Publishing Limited 2006...
Journal Articles
Engineering, Construction and Architectural Management (2006) 13 (3): 275–289.
Published: 01 May 2006
... be adequately forecast before operations begin. However, project management purposefully manipulates the project performance that drives the use of options and thereby the value added by options. Therefore project management quality may influence option values. Seeks to address this question. Design...
Journal Articles
Engineering, Construction and Architectural Management (2002) 9 (5-6): 378–387.
Published: 01 May 2002
...STEPHEN FOX; LAURENCE MARSH; GRAHAM COCKERHAM Since the early 1960s, the construction industry has been continually criticized for its low productivity and poor quality. Throughout this period, it has been widely recognized that building design has a significant impact on construction performance...
Journal Articles
Engineering, Construction and Architectural Management (2002) 9 (4): 318–324.
Published: 01 April 2002
... for the manufacturing industry but is applied here in the housing sector. Some hypothetical examples are presented. © MCB UP Limited 2002 Architecture Axiomatic design theory Design parameters Dunctional requirements Quality Standardization Engineering, Construction and Architectural Management 2002...
Journal Articles
Engineering, Construction and Architectural Management (2000) 7 (3): 211–220.
Published: 01 March 2000
... obtained either by prescribing overtime working hours or by procuring additional resources or a combination of both. However, excessively prolonged overtime work can generate quality problems, such as rework, and additional resources. With this in mind, there is a need for a model to assist project...
Journal Articles
Engineering, Construction and Architectural Management (2000) 7 (3): 232–240.
Published: 01 March 2000
...ALAN GRIFFITH Over the last 25 years, the construction industry has embraced quality management systems (QMS). More recently, environmental issues and health and safety legislation have introduced additional dedicated control procedures: environmental management systems (EMS) and health and safety...
Journal Articles
Engineering, Construction and Architectural Management (1998) 5 (3): 220–227.
Published: 01 March 1998
... to university professors. The Delphi technique was employed to obtain a consensus conclusion on the factors required to improve construction quality in Egypt, together with their relative importance. The respondents generated 16 factors and the relative importance of each factor was determined. For example...
Journal Articles
Engineering, Construction and Architectural Management (1997) 4 (1): 3–22.
Published: 01 January 1997
... of explanation are considered to account for these findings. The first accepts as given the existing divisions of responsibility and conventions for specifying quality and looks to identify the reasons for non‐compliance. The second proposes that the present arrangements and conventions are inappropriate...
Journal Articles
Engineering, Construction and Architectural Management (1994) 1 (1): 5–16.
Published: 01 January 1994
... Continuous improvement Facilitators Quality Safety workshops and communications Engineering, Construction and Architectural Management 1994 1 | 1, 5-16 Project specific partnering ROBERT K. LORAINE Applied Project Research Ltd, Ryecroft, Upper Hartfield, East Sussex, TN7 4DN, UK Paper submitted 22...
