Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-9 of 9
Keywords: Risk factors
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Xiaobo Shi, Yan Liu, Kunkun Ma, Zixin Gu, Yaning Qiao, Guodong Ni, Chibuzor Ojum, Alex Opoku, Yong Liu
Engineering, Construction and Architectural Management (2025) 32 (5): 3432–3452.
Published: 20 February 2024
...Xiaobo Shi; Yan Liu; Kunkun Ma; Zixin Gu; Yaning Qiao; Guodong Ni; Chibuzor Ojum; Alex Opoku; Yong Liu Purpose The purpose is to identify and evaluate the safety risk factors in the coal mine construction process. Design/methodology/approach The text mining technique was applied in the stage...
Journal Articles
Engineering, Construction and Architectural Management (2025) 32 (2): 824–846.
Published: 25 August 2023
...Yunfeng Liu; Xueqing Wang; Jingxiao Zhang; Sijia Guo Purpose Early termination of public–private partnerships (PPPs) in China is caused by various risk factors, resulting in significant losses. This study aimed to clarify the key factors and identify the causal relationships among these factors...
Includes: Supplementary data
Journal Articles
Engineering, Construction and Architectural Management (2024) 31 (11): 4398–4416.
Published: 08 May 2023
...Seyed Ashkan Zarghami Purpose The overarching objective of this paper is to examine the cause–effect relationships among building and information modeling (BIM)-related risk factors and their impact on the implementation of BIM in construction projects. Design/methodology/approach This paper...
Journal Articles
Engineering, Construction and Architectural Management (2023) 30 (8): 3259–3291.
Published: 11 July 2022
...Yi Wang; Xiaopeng Deng; Hongtao Mao Purpose This paper aims to explore the key risk factors affecting the Personnel Localization Management of international construction projects under the major public emergencies represented by the novel coronavirus pneumonia pandemic (hereinafter COVID-19...
Journal Articles
Engineering, Construction and Architectural Management (2023) 30 (7): 3073–3094.
Published: 03 May 2022
... to identify risk factors of HRC implementation and preliminarily understand factor interactions. Second, a questionnaire survey was conducted to determine the degree of interactions between risk factors. Third, based on the data collected from the questionnaire survey, SNA metrics were used to find critical...
Journal Articles
Engineering, Construction and Architectural Management (2023) 30 (5): 1864–1882.
Published: 09 February 2022
.... The OA stage constitutes the highest end of the MiC delivery and supply chains, where several inherited and symbiotic errors and risk events become realities, negatively impacting the MiC project's success. This study explored the severities of OA risk factors for MiC projects. Design/methodology...
Journal Articles
Engineering, Construction and Architectural Management (2021) 28 (4): 934–968.
Published: 30 July 2020
... the source of risks in construction to achieve the project expectation. Risk factors cause a threat to the project objectives regarding time, cost and quality. It is additionally a vital component in deviating from the client's expectation of productivity, safety and standards. This research aims...
Journal Articles
Engineering, Construction and Architectural Management (2020) 27 (9): 2687–2713.
Published: 28 May 2020
... risk mitigation measures on macro-level risk factors in the international marketplace. Design/methodology/approach The authors initially identified 26 risk variables and nine risk mitigation measures through a literature review, which were then verified for their pertinence to international...
Journal Articles
Engineering, Construction and Architectural Management (2017) 24 (3): 451–462.
Published: 15 May 2017
... management is rarely practised in construction projects due to the lack of contractors’ awareness of key risks. The purpose of this paper is to focus on the investigation of risk factors in construction projects in Italy from contractors’ perspective. Design/methodology/approach Semi-structured...
