Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-8 of 8
Keywords: Schedule
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Research on the construction and optimization model of robustness indicators of program schedules considering multi-stakeholder cascading effects
Available to Purchase
Engineering, Construction and Architectural Management 1–28.
Published: 15 December 2025
...Hui Feng; Jingyan Chen; Xu Chen; Juan Ding Purpose This study fully considers the cascading effects in the program, constructs a schedule robustness evaluation indicator under the cascading effects of program schedule and quality and proposes an optimization method for program schedule robustness...
Journal Articles
Application of the maturity model for collaborative scheduling for construction projects
Available to Purchase
Engineering, Construction and Architectural Management (2025) 32 (11): 7399–7425.
Published: 28 October 2024
... and Schedulers, Scheduling Representation, Goal Alignment with Owner, and Communication. Iterative rounds of tallies and discussion continued until the participants achieved consensus for the pillars. Collaboration Schedule Alignment Maturity model Delphi method MODA...
Journal Articles
The gold standard: developing a maturity model to assess collaborative scheduling
Available to Purchase
Engineering, Construction and Architectural Management (2023) 30 (4): 1636–1656.
Published: 03 February 2022
...Natalie M. Scala; Min Liu; Thais da Costa Lago Alves; Vincent Schiavone; Dominique Hawkins Purpose The overall contribution of this work is to provide a usable maturity model for collaborative scheduling (CS) that extends the literature, identifies inconsistencies in schedule development...
Journal Articles
Application framework for safety-centric construction acceleration planning
Available to Purchase
Engineering, Construction and Architectural Management (2023) 30 (4): 1401–1422.
Published: 24 January 2022
... taking sufficient preventive measures against safety hazards and accidents. As planning construction acceleration by factoring in safety constraints inevitably drives up cost, it is imperative to control increases in activity costs at the local level in connection with schedule acceleration planning...
Journal Articles
Client and contractor roles in schedule incentive/disincentive projects: An empirical study from India
Available to Purchase
Engineering, Construction and Architectural Management (2019) 26 (3): 386–407.
Published: 11 February 2019
...Abid Hasan; Kumar Neeraj Jha Purpose Delays in construction projects can be very expensive due to their adverse effects on project cost and profit margin. To overcome this problem, clients in the construction industry sometimes use schedule incentive/disincentive (I/D) contracting strategy...
Journal Articles
Green building projects: schedule performance, influential factors and solutions
Available to Purchase
Engineering, Construction and Architectural Management (2015) 22 (3): 327–346.
Published: 18 May 2015
...Bon-Gang Hwang; Xianbo Zhao; Lene Lay Ghim Tan Purpose – The purposes of this paper are to: investigate schedule performance of new and retrofitting green building projects; identify the critical factors that influence the schedule performance of new and retrofitting green building projects...
Journal Articles
Rework and schedule performance: A profile of incidence, impact, causes and solutions
Available to Purchase
Engineering, Construction and Architectural Management (2014) 21 (2): 190–205.
Published: 11 March 2014
...Bon-Gang Hwang; Shimin Yang Purpose – Rework is a pervasive problem in the construction industry. While several studies have examined the relationship between rework and cost overruns, few have related rework to schedule performance impacts. As a result, the purpose of this paper is to assess...
Journal Articles
Improving the performance of Earned Value Analysis as a construction project management tool
Available to Purchase
Engineering, Construction and Architectural Management (2000) 7 (4): 399–411.
Published: 01 April 2000
...) and the Schedule Performance Index (SPI) are well above or below unity then, especially in the early stages of the project, traditionally applied EVA predictions can be un‐realiable and require further investigation and evaluation. WPM provides a vehicle for judging the performance of EVA by applying...
