Skip to Main Content
Keywords: Schedule
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Journal Articles
Journal Articles
Engineering, Construction and Architectural Management (2025) 32 (11): 7399–7425.
Published: 28 October 2024
... and Schedulers, Scheduling Representation, Goal Alignment with Owner, and Communication. Iterative rounds of tallies and discussion continued until the participants achieved consensus for the pillars. Collaboration Schedule Alignment Maturity model Delphi method MODA...
Journal Articles
Engineering, Construction and Architectural Management (2023) 30 (4): 1636–1656.
Published: 03 February 2022
...Natalie M. Scala; Min Liu; Thais da Costa Lago Alves; Vincent Schiavone; Dominique Hawkins Purpose The overall contribution of this work is to provide a usable maturity model for collaborative scheduling (CS) that extends the literature, identifies inconsistencies in schedule development...
Journal Articles
Engineering, Construction and Architectural Management (2023) 30 (4): 1401–1422.
Published: 24 January 2022
... taking sufficient preventive measures against safety hazards and accidents. As planning construction acceleration by factoring in safety constraints inevitably drives up cost, it is imperative to control increases in activity costs at the local level in connection with schedule acceleration planning...
Journal Articles
Engineering, Construction and Architectural Management (2019) 26 (3): 386–407.
Published: 11 February 2019
...Abid Hasan; Kumar Neeraj Jha Purpose Delays in construction projects can be very expensive due to their adverse effects on project cost and profit margin. To overcome this problem, clients in the construction industry sometimes use schedule incentive/disincentive (I/D) contracting strategy...
Journal Articles
Engineering, Construction and Architectural Management (2015) 22 (3): 327–346.
Published: 18 May 2015
...Bon-Gang Hwang; Xianbo Zhao; Lene Lay Ghim Tan Purpose – The purposes of this paper are to: investigate schedule performance of new and retrofitting green building projects; identify the critical factors that influence the schedule performance of new and retrofitting green building projects...
Journal Articles
Engineering, Construction and Architectural Management (2014) 21 (2): 190–205.
Published: 11 March 2014
...Bon-Gang Hwang; Shimin Yang Purpose – Rework is a pervasive problem in the construction industry. While several studies have examined the relationship between rework and cost overruns, few have related rework to schedule performance impacts. As a result, the purpose of this paper is to assess...
Journal Articles
Engineering, Construction and Architectural Management (2000) 7 (4): 399–411.
Published: 01 April 2000
...) and the Schedule Performance Index (SPI) are well above or below unity then, especially in the early stages of the project, traditionally applied EVA predictions can be un‐realiable and require further investigation and evaluation. WPM provides a vehicle for judging the performance of EVA by applying...

or Create an Account

Close Modal
Close Modal