Skip to Main Content
Keywords: procurement
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Journal Articles
Journal Articles
Journal Articles
Journal Articles
Journal Articles
Journal Articles
Journal Articles
Engineering, Construction and Architectural Management (2023) 30 (9): 3840–3857.
Published: 26 April 2022
...Amma Kyewaa Agyekum; Frank Desmond Kofi Fugar; Kofi Agyekum; Isaac Akomea-Frimpong; Hayford Pittri Purpose The absence of effective stakeholder engagement at the early planning and implementation stages impact projects negatively. However, the role of stakeholders in Sustainable Procurement (SP...
Journal Articles
Journal Articles
Engineering, Construction and Architectural Management (2017) 24 (6): 875–900.
Published: 20 November 2017
... Partnership Procurement Private finance Infrastructure has long been identified as a catalyst for economic growth. The demand for infrastructure development and the maintenance of existing infrastructure caused by economic growth and population increase has in many instances, overtaken the capacity...
Journal Articles
Engineering, Construction and Architectural Management (2017) 24 (5): 788–808.
Published: 18 September 2017
... barriers to be addressed within the Australian construction industry if government indigenous procurement policies are to achieve their stated aims of increasing the number of Indigenous firms in the industry. The results also have important implications for Indigenous businesses and for non-Indigenous...
Journal Articles
Engineering, Construction and Architectural Management (2017) 24 (5): 774–787.
Published: 18 September 2017
...Dai Q. Tran; Keith R. Molenaar; Bharath Kolli Purpose The purpose of this paper is to investigate procedures and practices to promote transparency in best-value procurement for the design and construction of highway projects with the goal of improving this evolving procurement method. Design...
Journal Articles
Engineering, Construction and Architectural Management (2017) 24 (2): 275–288.
Published: 20 March 2017
... 24 05 2016 © Emerald Publishing Limited 2017 Emerald Publishing Limited Licensed re-use rights only Housing Customer satisfaction Supervision Construction management Procurement Conflict resolution A number of problems continue to hinder the success of post conflict...
Journal Articles
Journal Articles
Engineering, Construction and Architectural Management (2014) 21 (6): 631–647.
Published: 17 November 2014
... Procurement Project delivery methods The selection of an appropriate project delivery method can have a major impact on the achievement of project goals and objectives. Researchers (e.g. Oyetunji and Anderson, 2006 ; Luu et al., 2003 ; Love et al., 1998) have shown that using...
Journal Articles
Journal Articles
Engineering, Construction and Architectural Management (2013) 20 (1)
Published: 04 January 2013
... Procurement Contractor workers Tendering Subcontractoring Clients 2012 Awards for Excellence Article Type: 2012 Awards for Excellence From: Engineering, Construction and Architectural Management, Volume 20, Issue 1. The following article was selected...
Journal Articles
Engineering, Construction and Architectural Management (2012) 19 (5): 543–556.
Published: 31 August 2012
...‐related factors such as competence, commitment, communication and cooperation towards the success of a construction project. These factors being the core element in relationship‐based procurement reinforced the need and viability of such procurement methods to the Malaysian construction industry...
Journal Articles
Engineering, Construction and Architectural Management (2011) 18 (3): 297–311.
Published: 03 May 2011
... from the design process before appropriate maturity is achieved in order to initiate and drive the procurement process and other early construction activities. Design iterations may, and possibly should, continue after that information has been taken and used, and the design would subsequently evolve...
Journal Articles
Journal Articles
Engineering, Construction and Architectural Management (2010) 17 (3): 292–308.
Published: 04 May 2010
... considered. Public‐private partnership (PPP) has increasingly been suggested for these projects, but the suitability of using this procurement method in Hong Kong is yet to be studied empirically. The purpose of this paper is to specifically consider whether PPPs should be used to procure public works...

or Create an Account

Close Modal
Close Modal