Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Issue Section
Date
Availability
1-20 of 44
Keywords: procurement
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Engineering, Construction and Architectural Management (2025) 32 (13): 319–335.
Published: 12 August 2025
...Uzor Onyia; Bankole Awuzie; Matthew Ikuabe; Lovelin Ifeoma Obi Purpose The procurement phase of the construction project lifecycle remains critical for facilitating successful project outcomes, mainly as it concerns sustainability performance. Therefore, integrating circular economy principles...
Journal Articles
Engineering, Construction and Architectural Management (2026) 33 (7): 5300–5317.
Published: 25 April 2025
...Nana Kwame Obeng-Ahenkora; Humphrey Danso; Nongiba Alkanam Kheni Purpose Procurement and supply of construction materials are crucial aspects of the construction sector and therefore require attention for their development. Project objectives are fulfilled through the appropriate selection...
Journal Articles
Tennakoon Mudiyanselage Maheshi Pabasara Tennakoon, Nicholas Chileshe, Raufdeen Rameezdeen, J. Jorge Ochoa, Aparna Samaraweera
Engineering, Construction and Architectural Management (2025) 32 (13): 104–132.
Published: 19 March 2025
...://creativecommons.org/licences/by/4.0/legalcode Resilience Governance Transaction cost Procurement Agility Flexibility Visibility The global administration of offsite construction supply chain operations faced significant disruptions due to COVID-19. It brought deficiencies in existing supply chain...
Journal Articles
Engineering, Construction and Architectural Management (2024) 31 (13): 285–302.
Published: 26 April 2024
...Luís Jacques de Sousa; João Poças Martins; Luís Sanhudo Purpose Factors like bid price, submission time, and number of bidders influence the procurement process in public projects. These factors and the award criteria may impact the project’s financial compliance. Predicting budget compliance...
Journal Articles
Ali Mohammad Mirzaee, Towhid Pourrostam, Javad Majrouhi Sardroud, M. Reza Hosseini, Payam Rahnamayiezekavat, David Edwards
Engineering, Construction and Architectural Management (2024) 31 (1): 405–431.
Published: 16 September 2022
... these is undesirable performance (cf. Sharif and Kerachian, 2018 ; Ahmadabadi and Heravi, 2019). During recent decades, very few studies have investigated the root causes and prevention of disputes associated with the PPP procurement path. Zheng et al. (2021b) identified a small number of dispute...
Journal Articles
Engineering, Construction and Architectural Management (2023) 30 (9): 3781–3797.
Published: 27 June 2022
... on the site should be cleared quickly to prevent contamination (Chung et al., 2020 ; Lee et al., 2021). COVID-19 Procurement General contractors Competencies Project delivery Selecting the right contractor for a task is a key criterion to ensure successful project...
Journal Articles
Engineering, Construction and Architectural Management (2023) 30 (9): 3840–3857.
Published: 26 April 2022
...Amma Kyewaa Agyekum; Frank Desmond Kofi Fugar; Kofi Agyekum; Isaac Akomea-Frimpong; Hayford Pittri Purpose The absence of effective stakeholder engagement at the early planning and implementation stages impact projects negatively. However, the role of stakeholders in Sustainable Procurement (SP...
Journal Articles
Engineering, Construction and Architectural Management (2021) 28 (4): 1214–1240.
Published: 10 August 2020
... 02 06 2019 20 01 2020 18 02 2020 06 03 2020 © Emerald Publishing Limited 2020 Emerald Publishing Limited Licensed re-use rights only IPD 5D BIM Collaboration Alliancing Simulation Procurement Partnering agreement IPD relies on open pricing...
Journal Articles
Engineering, Construction and Architectural Management (2017) 24 (6): 875–900.
Published: 20 November 2017
... Partnership Procurement Private finance Infrastructure has long been identified as a catalyst for economic growth. The demand for infrastructure development and the maintenance of existing infrastructure caused by economic growth and population increase has in many instances, overtaken the capacity...
Journal Articles
Engineering, Construction and Architectural Management (2017) 24 (5): 788–808.
Published: 18 September 2017
... barriers to be addressed within the Australian construction industry if government indigenous procurement policies are to achieve their stated aims of increasing the number of Indigenous firms in the industry. The results also have important implications for Indigenous businesses and for non-Indigenous...
Journal Articles
Engineering, Construction and Architectural Management (2017) 24 (5): 774–787.
Published: 18 September 2017
...Dai Q. Tran; Keith R. Molenaar; Bharath Kolli Purpose The purpose of this paper is to investigate procedures and practices to promote transparency in best-value procurement for the design and construction of highway projects with the goal of improving this evolving procurement method. Design...
Journal Articles
Engineering, Construction and Architectural Management (2017) 24 (2): 275–288.
Published: 20 March 2017
... 24 05 2016 © Emerald Publishing Limited 2017 Emerald Publishing Limited Licensed re-use rights only Housing Customer satisfaction Supervision Construction management Procurement Conflict resolution A number of problems continue to hinder the success of post conflict...
Journal Articles
Engineering, Construction and Architectural Management (2015) 22 (6): 644–668.
Published: 16 November 2015
...Akmal Aini Othman; Sofiah Abd Rahman; Veera Pandiyan KalIani Sundram; Muhammad Awais Bhatti Purpose – The purpose of this paper is to establish a link between marketing resources, procurement process coordination (PPC) and firm performance. To allow for greater understanding in the field...
Journal Articles
Engineering, Construction and Architectural Management (2014) 21 (6): 631–647.
Published: 17 November 2014
... Procurement Project delivery methods The selection of an appropriate project delivery method can have a major impact on the achievement of project goals and objectives. Researchers (e.g. Oyetunji and Anderson, 2006 ; Luu et al., 2003 ; Love et al., 1998) have shown that using...
Journal Articles
Engineering, Construction and Architectural Management (2013) 20 (6): 543–562.
Published: 11 November 2013
...Lu Weisheng; Anita M.M. Liu; Wang Hongdi; Wu Zhongbing Purpose – The purpose of this paper is to attempt to shed light on procurement innovation by examining two state-of-the-art procurement systems in China – an agent-construction system (ACS or in Chinese Dai Jian Zhi) and public...
Journal Articles
Engineering, Construction and Architectural Management (2013) 20 (1)
Published: 04 January 2013
... Procurement Contractor workers Tendering Subcontractoring Clients 2012 Awards for Excellence Article Type: 2012 Awards for Excellence From: Engineering, Construction and Architectural Management, Volume 20, Issue 1. The following article was selected...
Journal Articles
Engineering, Construction and Architectural Management (2012) 19 (5): 543–556.
Published: 31 August 2012
...‐related factors such as competence, commitment, communication and cooperation towards the success of a construction project. These factors being the core element in relationship‐based procurement reinforced the need and viability of such procurement methods to the Malaysian construction industry...
Journal Articles
Engineering, Construction and Architectural Management (2011) 18 (3): 297–311.
Published: 03 May 2011
... from the design process before appropriate maturity is achieved in order to initiate and drive the procurement process and other early construction activities. Design iterations may, and possibly should, continue after that information has been taken and used, and the design would subsequently evolve...
Journal Articles
Engineering, Construction and Architectural Management (2011) 18 (2): 188–205.
Published: 01 March 2011
... Emerald Group Publishing Limited 2011 Procurement Incentive schemes Hong Kong … the contractor is paid a fixed fee for his profit and reimbursed for the actual cost of engineering, materials, construction labour, but only up to the ceiling figure established as the “maximum guaranteed...
Journal Articles
Engineering, Construction and Architectural Management (2010) 17 (3): 292–308.
Published: 04 May 2010
... considered. Public‐private partnership (PPP) has increasingly been suggested for these projects, but the suitability of using this procurement method in Hong Kong is yet to be studied empirically. The purpose of this paper is to specifically consider whether PPPs should be used to procure public works...
