Open figure viewer
Significance
Data centre power requirements are causing grid congestion because of limited local grid infrastructure, forcing new centres to locate to places further from consumers. Secondary markets with secure power supplies look set to attract more data centre investment.
Impacts
Data centre growth, and localised grid congestion, will add to pressure to invest and develop electrical grid infrastructure.
Demand for liquid cooling technologies will rise as data centre rack density increases.
Data centre operators will look to secure firm power supplies, potentially backing new technologies such as small modular reactors.
© Oxford Analytica 2025. All rights reserved. This content contains general information about geopolitical, macroeconomic and social developments or (where stated) other matters. It does not contain advice or recommendations that may be relied on. Where links to external websites are provided, this does not indicate that Oxford Analytica or Emerald agree with, endorse or have checked for accuracy the contents of said sites.
2025
You do not currently have access to this content.