Open figure viewer
A reduction in waiting lists for in‐patient oral surgery together with an improved service for minor procedures by the use of a day‐bed facility is the proposed solution to the problem studied. The approach used relies on adopting a production/operations management (POM) viewpoint combined with an interfacing methodology based on that of the soft systems school.
This content is only available via PDF.
© MCB UP Limited
1991
You do not currently have access to this content.
