Open figure viewer
Building Contract — Implied warranty of fitness of materials — Excluded by special circumstances — Term of Contract that materials should be obtained from nominated contractors — Inherent defect — Whether main contractor in breach of Warranty.
This content is only available via PDF.
© MCB UP Limited
1968
You do not currently have access to this content.
