The purpose of this paper is to prioritize and establish relationships among the barriers that affect green, lean and Six Sigma (GLSS) implementation in the Indian construction sector.

A hierarchal model consisting of several levels is generated by the interpretive structural modelling (ISM) methodology. For establishing the priority weights and the ranking of the barriers, the relationships among barriers from the model in ISM are used to provide an output from the analytic network process (ANP). The 12 vital barriers that affect implementation of GLSS adoption were shortlisted from literature and then finalized in consultation with experts belonging from both industry and academia.

Based on the ISM model “Lack of awareness for green products, Lack of top management commitment and involvement as well as Lack of funds along with an improper estimation” are at the highest level. Similar results were found while ranking the barriers through ISM–ANP integration.

This study identified and prioritized the barriers that affect GLSS implementation using ISM–ANP approach, such a study has not been attempted previously for the construction sector. The ISM model and ANP ranks are based on the inputs gathered from experts and academicians so as to ensure practical validity. This approach is assists decision-makers to focus on the key barriers priority basis and enables them to implement GLSS smoothly.

Licensed re-use rights only
You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Pay-Per-View Access
$41.00
Rental

or Create an Account

Close Modal
Close Modal