Skip to Main Content
Article navigation
Purpose

Legions of projects fail to attain their time and cost objectives due to ineffective coordination. This is often due to a lack of essential learning from projects because of insufficient communication and working experience. One of the key reasons why this occurs is that managers are unaware of what knowledge needs to be retained. In contrast with knowledge management research, which mostly focuses on the systems and processes for capturing, storing, and retrieval of knowledge, this paper investigates the nature of project communication and learning and their role on project time and cost control.

Design/methodology/approach

A stratified proportional purposive sampling approach was adopted in choosing the interview participants for the study. They are experienced industry practitioners working on building construction projects in Malaysia. Content analysis was then performed on the interview data. The identified variables were further validated by 11 industry experts from the three primary construction stakeholders.

Findings

The results of a series of 12 in-depth interviews with industry practitioners are provided to reveal the effective communication tools for sharing and learning in a project-based environment, the learning inducing situations involved, and the use of reusable project experiences to improve project time and cost control.

Research limitations/implications

A possible limitation of the study is its focus on a small group of Malaysian practitioners delimits the generalizability of the findings.

Originality/value

A two-phase model with three-step project management process of input, tools, and output is developed from the Project Management Body of Knowledge (PMBOK) Guide as an aid for more effective knowledge reuse in project time and cost control in the future.

Licensed re-use rights only
You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.
Pay-Per-View Access
$41.00
Rental

or Create an Account

Close Modal
Close Modal