Purpose

– The purpose of this paper is to develop and to empirically verify a model of project risk management maturity (PRMM).

Design/methodology/approach

– Theoretical work to develop the initial model of risk maturity. Empirical study by a cross-sectional survey to the Indonesian construction industry.

Findings

– A new model of PRMM is developed and empirically tested. The model is valid (face validity, content validity, discriminant validity, convergent validity, and criterion validity) and reliable.

Research limitations/implications

– A more comprehensive, follow-up study is required to gain more insights on the actual maturity level of Indonesian construction industry.

Practical implications

– The model is applicable to assess the organizational maturity level which in turn could be used for improving organization performance.

Originality/value

– The work demonstrates a novel approach in developing models by emphasizing on the empirical verification.

You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Pay-Per-View Access
$41.00
Rental

or Create an Account

Close Modal
Close Modal