Open figure viewer
A corrected attempt to determine the size of in‐process inventory and the manufacturing lead time for an n‐stage production system is made. This corrects the earlier model developed by Ornek and Collier by accurately deriving the model for determining the manufacturing cycle time.
This content is only available via PDF.
© MCB UP Limited
1989
You do not currently have access to this content.
