Open figure viewer
Addresses a deterministic maintenance‐scheduling problem for a group of non‐identical machines. The problem is formulated as a mixed integer non‐linear program which is approached heuristically. In the model formulation, it is assumed that a major overhaul brings the machine back to its new condition, whereas a minor overhaul restores it to a specified operating condition. An iterative solution procedure is developed to obtain a near‐optimal cyclic overhaul schedule. Presents a worked example to illustrate the proposed solution method.
This content is only available via PDF.
© MCB UP Limited
1994
You do not currently have access to this content.
