Article navigation

Addresses a deterministic maintenance‐scheduling problem for a group of non‐identical machines. The problem is formulated as a mixed integer non‐linear program which is approached heuristically. In the model formulation, it is assumed that a major overhaul brings the machine back to its new condition, whereas a minor overhaul restores it to a specified operating condition. An iterative solution procedure is developed to obtain a near‐optimal cyclic overhaul schedule. Presents a worked example to illustrate the proposed solution method.

This content is only available via PDF.
You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Pay-Per-View Access
$41.00
Rental

or Create an Account

Close subscription notice
Close access options