Article navigation

A fast production scheduling system, the very fast scheduler (VFS), has been developed by the authors. It creates a capacity constrained production schedule within one minute of elapsed time for problems of a size encountered in industry. The quality of the schedules is comparable with the best alternative heuristic scheduling techniques. The speed of the scheduler is such that it can be used on a real‐time basis to plan capacity, adjust priorities and other parameters and derive new schedules.

You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Pay-Per-View Access
$41.00
Rental

or Create an Account

Close subscription notice
Close access options