The paper aims to present a hands‐on activity for operations management (OM) education that simulates assembly operations common in industrial settings using polyvinyl chloride (PVC) threadable fittings utilised in water pipes as interchangeable parts for easy manual assembly.
The teaching method followed the philosophy of active learning and was applied in an action research approach; the proposed activity was tested and improved during applications in the classroom.
The applicability of the method was proven during in‐class exercises. The results were confirmed with positive feedback from the students involved in the exercises, which was obtained through a survey conducted after a set of applications.
Although the proposed activity may have several possibilities for application, this paper focuses specifically on teaching the topics of work measurement and assembly line balancing, thus limiting the generalisability of these findings to other OM techniques. Therefore, it is important that the activity is further adapted to teach other OM topics.
The activity performed with pipe fittings represents a practical exercise that contributes to reduction of the gap between theory and practice in OM education. Using simple and low cost materials, the students are involved in creating a real process from a fictional product.
This paper presents an experiential learning exercise applied using an innovative approach, using pipe fittings as interchangeable parts assembled in a production line.
