Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-7 of 7
Keywords: Work measurement
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Simulation of assembly operations using interchangeable parts for OM education: A hands‐on activity with water pipe fittings
Available to Purchase
International Journal of Operations & Production Management (2012) 32 (12): 1427–1440.
Published: 09 November 2012
.../implications Although the proposed activity may have several possibilities for application, this paper focuses specifically on teaching the topics of work measurement and assembly line balancing, thus limiting the generalisability of these findings to other OM techniques. Therefore, it is important...
Journal Articles
Systematic approach to activity based costing of the production planning activity in the book manufacturing industry
Available to Purchase
International Journal of Operations & Production Management (2000) 20 (1): 103–115.
Published: 01 January 2000
... Work measurement Direct costs Activity‐based costing In book manufacturing, just as in any other business, there are many jobs that are not directly related to the manufacturing of the product. There are jobs related to human resources, customer services, billing, information systems...
Journal Articles
The SPT Priority Sequence Rule: The Illusion of Efficiency and the Reality of Bottlenecks
Available to Purchase
International Journal of Operations & Production Management (1994) 14 (12): 70–78.
Published: 01 December 1994
... scheduling heuristic of choice for all job shop scheduling circumstances. Bottlenecks Process control Simulation Work measurement Work scheduling The most consistent recommendation of production and operations management (P/OM) scholars in matters pertaining to job shop management...
Journal Articles
Sample Size Formula in Work Measurement under a Fuzzy Environment
Available to Purchase
International Journal of Operations & Production Management (1994) 14 (1): 89–98.
Published: 01 January 1994
...A. Gill; C.R. Bector; O. Hawaleshka The sample size formula is extensively used in work measurement. However, this formula, based on statistical techniques, demands that parameters should be precisely assessed. In some situations, when there is vagueness involved in the assessment of parameters...
Journal Articles
Productivity Management of Indirect Labour through Variable Work Measurement and Control
Available to Purchase
International Journal of Operations & Production Management (1991) 11 (8): 48–58.
Published: 01 August 1991
...Jack Andin Wu; Nesa L'abbe Wu During the past several decades, the rapid expansion of service industry and the automation of manufacturing operations have gradually changed the ratio between direct and indirect labour in favour of the latter and created the need for indirect work measurement...
Journal Articles
Personal, Unavoidable Delay, and Fatigue Allowances for Setting Performance Standards
Available to Purchase
International Journal of Operations & Production Management (1990) 10 (5): 62–70.
Published: 01 May 1990
... efficiency, consequently it can be applied as a percentage of the normal time for only the effort or manual work time. Allowances Fatigue Industry Performance measurement Work measurement IJOPM 10,5 Personal, Unavoidable Delay, and Fatigue Allowances for Setting Performance Standards 62 Biman Das...
Journal Articles
Comparison of Labour Standards for a Greenhouse Tomato Production System: A Case Study
Available to Purchase
International Journal of Operations & Production Management (1990) 10 (3): 38–49.
Published: 01 March 1990
.... Such a work measurement system would enable the setting of job standards quickly and accurately. Standardised work models will facilitate cost control of labour operations, and provide data for evaluation of labour costs within future greenhouse system designs. The data indicate that, although the pre...
