Warwickshire County Council’s Libraries and Heritage Department has opened two new libraries in the past year – one of them in a former public swimming pool in the centre of Royal Leamington Spa. The £7 million redevelopment of the town’s Royal Pump Room complex presented an unexpected and irresistible opportunity which, you might say, plunged Libraries and Heritage “in at the deep end”. Almost 12 months on, members of the project team reflect on the process and problems of adapting a derelict listed building for a new purpose – and then moving an entire library across town. They review reactions to the new library and its extended services, both initially and once things settled down. Outstanding issues and ongoing concerns are covered, as well as the new library’s successes.
Article navigation
Case Report|
December 01 2000
From public baths to public library – or “how to save a historic building”
Mag Astill
Mag Astill
Mag Astill is Press Officer – Libraries and Heritage, Warwickshire County Council, Warwick, UK.
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1758-6909
Print ISSN: 0307-4803
© MCB UP Limited
2000
New Library World (2000) 101 (7): 303–308.
Citation
Astill M (2000), "From public baths to public library – or “how to save a historic building”". New Library World, Vol. 101 No. 7 pp. 303–308, doi: https://doi.org/10.1108/03074800010356535
Download citation file:
243
Views
New and popular articles
Suggested Reading
Raising the efficiency of the building lifetime with special emphasis on maintenance
Facilities (November,1998)
Breathing new life into redundant buildings
Facilities (January,2002)
Back to the future: the market for building conservation skills in the 1990s
Structural Survey (September,1997)
Library Construction from a Staff Perspective
Library Review (November,2002)
Building Libraries for the 21st Century: The Shape of Information
Library Review (November,2000)
Related Chapters
Old Wey Bridge refurbishment
Bridge Management 5: Inspection, maintenance, assessment and repair: Proceedings of the 5th International Conference on Bridge Management, organized by the University of Surrey, 11–13 April 2005
Threading the needle – holistic solutions in an urban junction improvement, East London
Bridge Management 5: Inspection, maintenance, assessment and repair: Proceedings of the 5th International Conference on Bridge Management, organized by the University of Surrey, 11–13 April 2005
Structural surveys and structural alterations
Temporary Works Part Two: Further Principles of Design and Construction
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
