Skip to Main Content
Article navigation
Purpose

This paper aims to propose and formulate a complicated routing/scheduling problem for multiple automated guided vehicles (AGVs) in a manufacturing system.

Design/methodology/approach

Considering the due date of AGVs requiring for material handling among shops in a jobshop layout, their earliness and tardiness are significant in satisfying the expected cycle time and from an economic view point. Therefore, the authors propose a mathematical program to minimize the penalized earliness and tardiness for a conflict-free and just-in-time production.

Findings

The model considers a new concept of turning point for deadlock resolution. As the mathematical program is difficult to solve with a conventional method, an optimization method in two stages, namely, searching the solution space and finding optimal solutions are proposed. The performance of the proposed mathematical model is tested in a numerical example.

Practical implications

A case study in real industrial environment is conducted. The findings lead the decision-makers to develop a user interface decision support as a simulator to plan the AGVs’ movement through the manufacturing network and help AGVs to prevent deadlock trap or conflicts. The proposed decision support can easily be commercialized.

Originality/value

The benefits of such commercialization are increase in the quality of material handling, improve the delivery time and prevent delays, decrease the cost of traditional handling, capability of computerized planning and control, intelligent tracking and validation experiments in simulation environment.

Licensed re-use rights only
You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.
Pay-Per-View Access
$41.00
Rental

or Create an Account

Close Modal
Close Modal