Crossing the volatile River Nith at Portrack in Dumfriesshire has presented railway engineers with severe problems for over 150 years, at least one previous attempt having been destroyed in a flood. Despite ongoing maintenance and repairs, the existing 11 span wrought iron structure, which carries the increasingly important Glasgow and South West Scotland line over the river, needed urgent replacement to reduce long-term costs and improve the safety and efficiency of the route. Carillion Rail and Scott Wilson Scotland carefully evaluated a number of options before recommending a realignment of the railway, which involved the replacement of two viaducts. Working in an environmentally sensitive location, adjacent to a ‘live’ railway and to a tight deadline required a tremendous amount of planning, cooperation and ingenuity by all parties; even the local estate owner became the project's architectural advisor. The centre-piece of the scheme is a spectacular 90 m curved truss-girder crossing the river, which was erected using the world's largest mobile crane. The meticulous planning and teamwork paid off with the construction of the entire project being completed on time, within budget and without disruption to the railway.
Article navigation
1 December 2004
Research Article|
December 01 2004
Portrack, Scotland—a major railway realignment
M. J. Hackney;
M. J. Hackney
Technical Director
Scott Wilson Scotland Ltd
Glasgow, UK
Search for other works by this author on:
K. Miller;
K. Miller
Programme Manager
Structures Scotland Territory, Network Rail
Search for other works by this author on:
C. Jencks
C. Jencks
Architectural Consultant
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
March 01 2004
Accepted:
July 28 2004
Online ISSN: 1751-7664
Print ISSN: 1478-4637
© 2004 Thomas Telford Ltd
2004
Proceedings of the Institution of Civil Engineers - Bridge Engineering (2004) 157 (4): 177–186.
Article history
Received:
March 01 2004
Accepted:
July 28 2004
Citation
Hackney MJ, Stocks A, Miller K, Jencks C (2004), "Portrack, Scotland—a major railway realignment". Proceedings of the Institution of Civil Engineers - Bridge Engineering, Vol. 157 No. 4 pp. 177–186, doi: https://doi.org/10.1680/bren.2004.157.4.177
Download citation file:
302
Views
New and popular articles
Suggested Reading
Gateshead Millennium Bridge, UK: fabrication, assembly and erection
Civil Engineering Innovation (January,2008)
A-frame rocker bearing replacement at Humber Bridge, UK
Proceedings of the Institution of Civil Engineers - Civil Engineering (April,2016)
Procurement, design and construction of the Clyde Arc, Glasgow
Proceedings of the Institution of Civil Engineers - Bridge Engineering (March,2009)
Gateshead Millennium Bridge, UK: fabrication, assembly and erection
Proceedings of the Institution of Civil Engineers - Bridge Engineering (March,2003)
Eight footbridges in the Rembrandt Park in Amsterdam
Proceedings of the Institution of Civil Engineers - Bridge Engineering (June,2006)
Related Chapters
Definitions
Prestressed Concrete Bridges: Design and Construction
Symbols and notation used
Prestressed Concrete Bridges: Design and Construction
General
Prestressed Concrete Bridges: Design and Construction
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
