Mizen Head Footbridge in County Cork, Ireland, is a reinforced concrete through-arch structure spanning 50 m. The original structure was completed in 1909. After 100 years of service the bridge was demolished and reconstructed in 2009/10. This paper describes the design and construction challenges of safely demolishing and reconstructing the bridge in a difficult site location. The bridge provided access to a lighthouse on a tiny island, Cloghán, at the tip of Mizen Head in southwest Cork. The original structure was commissioned by the Commissioners of Irish Lights (CIL). The structural form was chosen from a design competition held in the early 1900s. The entries to this competition are held in the CIL archives and are on display in the Visitors' Centre at Mizen Head.
Article navigation
September 2013
Research Article|
April 08 2013
The design and construction of the new Mizen Head Footbridge, Ireland
Kieran Ruane, BE, MSc(Eng), CEng, MIStructE, MIEI, MICE;
Kieran Ruane, BE, MSc(Eng), CEng, MIStructE, MIEI, MICE
1
Technical Director, RPS Consulting Engineers Ltd, Cork, Ireland
Search for other works by this author on:
Murt Coleman, BE, CEng, FIEI;
Murt Coleman, BE, CEng, FIEI
2
Managing Director, Carillion Irishenco Ltd, Kildare, Ireland
Search for other works by this author on:
Enda Collery, BA, BAI, CEng, MIEI;
Enda Collery, BA, BAI, CEng, MIEI
3
Contracts Manager, Carillion Irishenco Ltd, Kildare, Ireland
Search for other works by this author on:
Eoghan Lehane, Eur Ing, BE, CEng, MIEI, MCIWEM;
Eoghan Lehane, Eur Ing, BE, CEng, MIEI, MCIWEM
4
Civil Engineering and Property Manager, Commissioners of Irish Lights, Dublin, Ireland
Search for other works by this author on:
Brendan Minihane, Eur Ing, BE, CEng, MIEI;
Brendan Minihane, Eur Ing, BE, CEng, MIEI
5
Project Resident Engineer, Cork County Council, Cork, Ireland
Search for other works by this author on:
Ross O'Donovan, Dip Eng, BEng, CEng, MIEI;
Ross O'Donovan, Dip Eng, BEng, CEng, MIEI
6
Senior Resident Engineer, RPS Consulting Engineers Ltd, Cork, Ireland
Search for other works by this author on:
Noel O'Keeffe, Eur Ing, BE, CEng, FIEI, MICE;
Noel O'Keeffe, Eur Ing, BE, CEng, FIEI, MICE
7
County Engineer, Cork County Council, Cork, Ireland
Search for other works by this author on:
Kevin Power, BE, CEng, FIEI, MICE, MCIWEM
Kevin Power, BE, CEng, FIEI, MICE, MCIWEM
8
Director, RPS Consulting Engineers Ltd, Cork, Ireland
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
March 25 2011
Accepted:
December 08 2011
Online ISSN: 1751-7664
Print ISSN: 1478-4637
ICE Publishing: All rights reserved
2013
Proceedings of the Institution of Civil Engineers - Bridge Engineering (2013) 166 (3): 217–228.
Article history
Received:
March 25 2011
Accepted:
December 08 2011
Citation
Ruane K, Coleman M, Collery E, Lehane E, Minihane B, O'Donovan R, O'Keeffe N, Power K (2013), "The design and construction of the new Mizen Head Footbridge, Ireland". Proceedings of the Institution of Civil Engineers - Bridge Engineering, Vol. 166 No. 3 pp. 217–228, doi: https://doi.org/10.1680/bren.11.00018
Download citation file:
New and popular articles
Suggested Reading
Temporary support of five-storey building by column clamping
Proceedings of the Institution of Civil Engineers - Structures and Buildings (December,2015)
Temporary works for demolition of Earls Court Exhibition Centre in London, UK
Proceedings of the Institution of Civil Engineers - Civil Engineering (April,2020)
London Underground bridge slide at White City viaduct, UK
Proceedings of the Institution of Civil Engineers - Bridge Engineering (March,2008)
Construction engineering at The Acre, UK: how innovative props facilitated building reuse
Proceedings of the Institution of Civil Engineers - Civil Engineering (January,2023)
Some structural aspects of top-down demolition of concrete buildings
Proceedings of the Institution of Civil Engineers - Forensic Engineering (January,2018)
Related Chapters
A large scale demolition in a densely populated urban area – a case study
Bridge Management 5: Inspection, maintenance, assessment and repair: Proceedings of the 5th International Conference on Bridge Management, organized by the University of Surrey, 11–13 April 2005
REMOVAL OF GYPSUM PLASTER BY THE USE OF MICROWAVES
Challenges of Concrete Construction: Volume 5, Sustainable Concrete Construction: Proceedings of the International Conference held at the University of Dundee, Scotland, UK on 9–11 September 2002
TOTAL RECYCLING OPPORTUNITIES – TASTING THE TOPICS FOR THE CONFERENCE SESSION
Challenges of Concrete Construction: Volume 5, Sustainable Concrete Construction: Proceedings of the International Conference held at the University of Dundee, Scotland, UK on 9–11 September 2002
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.