The Tianjin Haihe movable bridge in China has the largest span among similar bridges in Asia. Owing to the dual characteristics of being both a bridge and heavy machinery with mechanical, hydraulic, electric and intelligent control devices, the construction of its steel box girder requires appropriate installation and control technology. Because of the stringent on-site navigation restrictions and blockage conditions, as well as mechanical characteristics during construction, a semi-supported cantilever installation and erection scheme is proposed, in which a bridge-erecting machine, temporary steel pipe support, bridge cantilever construction and other traditional methods are used in combination. Unlike traditional bridge closure technologies, new alignment closure and central locking closure control technologies are employed. The latter requires that the locking device be precisely assembled and adjusted to be horizontal for the suitable operation of the central locking equipment. The execution of this construction practice shows that the technology is feasible and effective.
Article navigation
March 2014
Research Article|
August 12 2013
Installation and control technology of the Haihe movable bridge, China
Ling Huang, PhD;
Ling Huang, PhD
1
Professor, Doctor of Engineering, Civil Engineering Institute, Shijiazhuang Railway University, Shijiazhuang City, Hebei Province, 050043, China
Search for other works by this author on:
YanLiang Shang, MSc;
YanLiang Shang, MSc
2
Vice Professor, Doctor of Engineering, Civil Engineering Institute, Shijiazhuang Railway University, Shijiazhuang City, Hebei Province, 050043, China
Search for other works by this author on:
Hao Zhang, PhD
Hao Zhang, PhD
3
Lecturer, Master, Civil Engineering Institute, Shijiazhuang Railway University, Shijiazhuang City, Hebei Province, 050043, China
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
August 30 2010
Accepted:
December 21 2012
Online ISSN: 1751-7664
Print ISSN: 1478-4637
ICE Publishing: All rights reserved
2014
Proceedings of the Institution of Civil Engineers - Bridge Engineering (2014) 167 (1): 54–60.
Article history
Received:
August 30 2010
Accepted:
December 21 2012
Citation
Huang L, Shang Y, Zhang H (2014), "Installation and control technology of the Haihe movable bridge, China". Proceedings of the Institution of Civil Engineers - Bridge Engineering, Vol. 167 No. 1 pp. 54–60, doi: https://doi.org/10.1680/bren.10.00040
Download citation file:
New and popular articles
Suggested Reading
Gateshead Millennium Bridge, UK: fabrication, assembly and erection
Civil Engineering Innovation (January,2008)
Gateshead Millennium Bridge, UK: fabrication, assembly and erection
Proceedings of the Institution of Civil Engineers - Bridge Engineering (March,2003)
Eight footbridges in the Rembrandt Park in Amsterdam
Proceedings of the Institution of Civil Engineers - Bridge Engineering (June,2006)
Footbridge over the Sant Adria Marina in Barcelona, Spain
Proceedings of the Institution of Civil Engineers - Bridge Engineering (December,2005)
A-frame rocker bearing replacement at Humber Bridge, UK
Proceedings of the Institution of Civil Engineers - Civil Engineering (April,2016)
Related Chapters
Case studies
Railway Bridge Maintenance
Introduction
Bridge Construction Equipment
Lord Hill’s Bridge Mitigation Works
Crossrail Project: Infrastructure Design and Construction
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.