Tay Road Bridge is a 42-span, 2ṡ25 km-long twin box viaduct carrying the A92 over the Tay Estuary between Dundee and Fife. Two navigation spans are located on either side of pier 32. Cargo vessels of up to 3500 DWT regularly transit the bridge inbound or outbound from Perth 33 km to the west passing under the bridge 2 h before or after high tide to complete the trips in one uninterrupted movement. The 4 kn tidal flow and the vessels' need to maintain a ‘through the water’ speed of 8 kn for steering combine to necessitate an unusually high ‘over ground’ speed of over 12 kn. Consequently, while relatively small, transitting vessels possess high kinetic energy, and in the event of collision it is this energy that has to be absorbed by the pier protection system. Assessment revealed that the consequence of ship collision would be severe, affecting structural equilibrium. The structures provided are reinforced concrete fender beams. For the most severe collision events, the tubular steel supporting piles are designed to deflect beyond the point at which the end moments cause section yielding, and it is the work done in the rotation of these plastic hinges that absorbs the majority of the collision energy. This paper describes the development and design of the protection structures, early contractor involvement, contract form and construction.
Article navigation
September 2014
Research Article|
June 04 2014
Pier collision protection at Tay Road Bridge, Scotland
John Redpath, BSc, CEng, MICE;
John Redpath, BSc, CEng, MICE
1
Senior Consultant, Jacobs UK Ltd, Glasgow, UK
Search for other works by this author on:
David MacKay, BEng, CEng, MICE;
David MacKay, BEng, CEng, MICE
2
Divisional Director, Jacobs UK Ltd, Glasgow, UK
Search for other works by this author on:
Bill Angus, BSc, MCIHT;
Bill Angus, BSc, MCIHT
3
Engineer, City Development Department, Dundee, UK
Search for other works by this author on:
Emmet Scanlan, BEng, MIEI
Emmet Scanlan, BEng, MIEI
4
Project Manager, VolkerStevin Ltd, Preston, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
May 20 2013
Accepted:
March 27 2014
Online ISSN: 1751-7664
Print ISSN: 1478-4637
ICE Publishing: All rights reserved
2014
Proceedings of the Institution of Civil Engineers - Bridge Engineering (2014) 167 (3): 249–261.
Article history
Received:
May 20 2013
Accepted:
March 27 2014
Citation
Redpath J, MacKay D, Angus B, Scanlan E (2014), "Pier collision protection at Tay Road Bridge, Scotland". Proceedings of the Institution of Civil Engineers - Bridge Engineering, Vol. 167 No. 3 pp. 249–261, doi: https://doi.org/10.1680/bren.13.00010
Download citation file:
New and popular articles
Suggested Reading
Reinforced concrete caissons for port structures in Spain
Maritime Engineering (June,2009)
Reinforcement corrosion of the Phoenix caissons after 75 years of marine exposure
Maritime Engineering (November,2020)
Design and construction of the Øresund tunnel
Proceedings of the Institution of Civil Engineers - Civil Engineering (November,2000)
WWII sea wall in St Aubin’s Bay, Jersey: infrastructure improvements to alleviate flooding
Proceedings of the Institution of Civil Engineers - Engineering History and Heritage (November,2018)
Extension to the Port of Tarragona breakwater, Spain
Maritime Engineering (September,2010)
Related Chapters
FIELD TRIALS ON COVERCRETE MONITORING SENSORS: A TEMPERATURE CORRECTION PROTOCOL FOR CONDUCTIVITY MEASUREMENTS
Innovations and Developments In Concrete Materials And Construction: Proceedings of the International Conference held at the University of Dundee, Scotland, UK on 9–11 September 2002
INTERNATIONAL DEVELOPMENTS IN THE FIELD OF AGEING MANAGEMENT OF NUCLEAR POWER INFRASTRUCTURE
Role of Concrete in Nuclear Facilities
CRITERIA FOR AND PREDICTION OF LIMIT STATES OF DEGRADATION OF REINFORCED CONCRETE STRUCTURES
Role of Concrete in Nuclear Facilities
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.