The Heathrow expansion project proposals comprise major works around Heathrow airport to allow the construction of new terminal buildings and the third runway. Owing to the critical nature of uninterrupted operation of both runway and the M25 motorway, the preliminary design had to be developed to minimise maintenance operations. At over 140 m in the total length, the adoption of an integral bridge of this length is in excess of most integral bridges in the UK, particularly where full-height abutments are being utilised. The maximum predicted expansion length also lies outside the limit equilibrium method set out in PD6694-1. As such, it was agreed that a full soil–structure interaction study should be carried out to assess the impacts of the structural behaviour of the bridge and its abutments. This paper looks at the calibration work for that study, the derivation of the earth pressures behind the walls, the behaviour of the abutment and how this compares with the predictions set out in PD 6694-1.
Article navigation
June 2020
Research Article|
February 26 2020
The integral bridge design concept for the third runway at Heathrow, UK
Jessica Sandberg, BE Hons (Civil Engineering), CEng, MICE;
Jessica Sandberg, BE Hons (Civil Engineering), CEng, MICE
Atkins Transportation, Epsom, UK (corresponding author: jessica.sandberg@atkinsglobal.com)
Search for other works by this author on:
Luca Magnino, BSc, MSc (Hons);
Luca Magnino, BSc, MSc (Hons)
Atkins Transportation, Epsom, UK
Search for other works by this author on:
Paul Nowak, BSc (Hons), ARSM, CEng, CGeol, MICE, MIMMM, FGS;
Paul Nowak, BSc (Hons), ARSM, CEng, CGeol, MICE, MIMMM, FGS
Atkins Infrastructure, Epsom, UK
Search for other works by this author on:
Michael Wiechecki, BEng (Hons), MIEAust;
Michael Wiechecki, BEng (Hons), MIEAust
Atkins Infrastructure, Epsom, UK
Search for other works by this author on:
Indrasenan Thusyanthan, BA/MEng, PhD, FICE, CEng, CMarEng
Indrasenan Thusyanthan, BA/MEng, PhD, FICE, CEng, CMarEng
Atkins Infrastructure, Epsom, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
September 30 2019
Accepted:
January 01 2020
Online ISSN: 1751-7664
Print ISSN: 1478-4637
ICE Publishing: All rights reserved
2020
Proceedings of the Institution of Civil Engineers - Bridge Engineering (2020) 173 (2): 112–120.
Article history
Received:
September 30 2019
Accepted:
January 01 2020
Citation
Sandberg J, Magnino L, Nowak P, Wiechecki M, Thusyanthan I (2020), "The integral bridge design concept for the third runway at Heathrow, UK". Proceedings of the Institution of Civil Engineers - Bridge Engineering, Vol. 173 No. 2 pp. 112–120, doi: https://doi.org/10.1680/jbren.19.00044
Download citation file:
New and popular articles
Suggested Reading
Influence of flow conditions on scour hole shape for pier groups
Proceedings of the Institution of Civil Engineers - Water Management (March,2013)
Non-linear soil–structure interaction of multi-span reinforced concrete integral bridge
Proceedings of the Institution of Civil Engineers - Bridge Engineering (January,2021)
Design and construction of Zambezi River Bridge, Mozambique
Proceedings of the Institution of Civil Engineers - Bridge Engineering (November,2012)
Innovative bankseat for new Highfield Lane Bridge, UK
Proceedings of the Institution of Civil Engineers - Bridge Engineering (September,2007)
Repair and stabilisation of Trinity Bridge, Crowland, UK
Proceedings of the Institution of Civil Engineers - Bridge Engineering (March,2005)
Related Chapters
Analysis of foundations for major bridges
Seismic Design of Foundations: Concepts and applications
USE OF COMPOSITE STRUCTURES IN A BUILDING ABOVE A METRO STATION
Innovations and Developments In Concrete Materials And Construction: Proceedings of the International Conference held at the University of Dundee, Scotland, UK on 9–11 September 2002
Tower crane bases
Temporary Works: Principles of Design and Construction
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
