The embedded pile-cap design in the Hong Kong–Zhuhai–Macao Bridge project meant that prefabricated pier shafts and pile caps had to be installed under water. This posed a host of daunting construction-related challenges. The designer for the bridge – the Highway Planning and Design Institute, Beijing, China – proposed a method using temporary retaining structures to assist in the underwater installation. According to the local hydrogeological conditions and the capacity of the equipment available in each section, three methods of construction for these temporary works were used. Following completion of the project in 2018, this paper provides a technical comparison of the three methods with the aim that it will serve as a reference for similar projects in the future.
Article navigation
March 2021
Research Article|
June 22 2020
Methods used to construct underwater pile caps on the Hong Kong–Zhuhai–Macao Bridge
Mingshan Fang, PhD
;
Mingshan Fang, PhD
Vice-Chief Engineer, Hong Kong–Zhuhai–Macao Bridge Authority, Zhuhai, Hangzhou, P. R. China; Zhejiang Communications Investment Group Co., Ltd, P. R. China (corresponding author: 18998161966@189.cn)
Search for other works by this author on:
Lizhi Yu, BE;
Lizhi Yu, BE
Vice-Chief Engineer, Poly Changda Engineering Co., Ltd, Guangzhou, P. R. China
Search for other works by this author on:
Yu Tan, MS
Yu Tan, MS
PhD candidate, Zhejiang University, Hangzhou, P. R. China; Zhejiang Communications Investment Group Co., Ltd, P. R. China
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
April 08 2019
Accepted:
May 13 2020
Online ISSN: 1751-7664
Print ISSN: 1478-4637
ICE Publishing: All rights reserved
2020
Proceedings of the Institution of Civil Engineers - Bridge Engineering (2021) 174 (1): 3–12.
Article history
Received:
April 08 2019
Accepted:
May 13 2020
Citation
Fang M, Yu L, Tan Y (2021), "Methods used to construct underwater pile caps on the Hong Kong–Zhuhai–Macao Bridge". Proceedings of the Institution of Civil Engineers - Bridge Engineering, Vol. 174 No. 1 pp. 3–12, doi: https://doi.org/10.1680/jbren.19.00013
Download citation file:
New and popular articles
Suggested Reading
High-resolution sonars set to revolutionise bridge scour inspections
Proceedings of the Institution of Civil Engineers - Civil Engineering (February,2015)
Reduction of pier scour using bed suction and jet injection
Proceedings of the Institution of Civil Engineers - Water Management (February,2014)
An unusual marine outfall off central California, USA
Proceedings of the Institution of Civil Engineers - Water and Maritime Engineering (September,2001)
Delivering the Cheung Chau submarine pipeline in Hong Kong using NEC3
Proceedings of the Institution of Civil Engineers - Civil Engineering (June,2016)
Loch Drunkie: Underwater lining of a 150-year-old cast iron outlet pipe
Dams and Reservoirs (June,2021)
Related Chapters
Lateral cyclic pile–soil interaction studies on a rigid model
monopile
ICE Themes Wind Turbine Foundations
22 Definitions
Port designer's handbook
Channels and harbour basins
Port Designer's Handbook
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
