The new Broadway Bridge over the Arkansas River is located in downtown Little Rock, AR, USA. The Arkansas Department of Transportation replaced the existing historical structure, which was costly to maintain and considered structurally deficient. The new iconic structure consists of two basket-handled 134 m tied-arch bridges, which are designed to accommodate 24 000 vehicles daily, and includes a shared-used path. The US$98 million bridge was completed in 2017. Located along the existing alignment in a downtown metropolitan area, impacts to traffic were a prime concern. The bridge was closed to traffic for 6 months to allow for construction and to float the new arches into place. Throughout design, fracture-critical members were given careful consideration. The tie girder was designed with a bolted connection to prevent a fracture in one plate from propagating throughout the cross-section. It was then analysed as a three-sided section at the extreme event limit state. This internal redundancy minimised the potential risk of a catastrophic structural failure. This paper discusses the design considerations for the fracture-critical members, the construction technique and the expected movement of the main-span tied-arch superstructures.
Article navigation
21 December 2023
Research Article|
September 05 2022
Broadway Bridge tied arches replacement project, AR, USA
Natalie McCombs, PE, SE, ENV SP
;
Natalie McCombs, PE, SE, ENV SP
HNTB Associate Fellow, Senior Technical Advisor, HNTB Corporation, Kansas City, MO, USA
Search for other works by this author on:
Sarah Larson, PE
Sarah Larson, PE
Project Engineer, HNTB Corporation, Kansas City, MO, USA (corresponding author: sjlarson@hntb.com)
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
December 29 2021
Accepted:
July 29 2022
Online ISSN: 1751-7664
Print ISSN: 1478-4637
Emerald Publishing Limited: All rights reserved
2022
Proceedings of the Institution of Civil Engineers - Bridge Engineering (2023) 176 (4): 266–273.
Article history
Received:
December 29 2021
Accepted:
July 29 2022
Citation
McCombs N, Larson S (2023), "Broadway Bridge tied arches replacement project, AR, USA". Proceedings of the Institution of Civil Engineers - Bridge Engineering, Vol. 176 No. 4 pp. 266–273, doi: https://doi.org/10.1680/jbren.21.00101
Download citation file:
New and popular articles
Suggested Reading
Footbridge over the Sant Adria Marina in Barcelona, Spain
Proceedings of the Institution of Civil Engineers - Bridge Engineering (December,2005)
Gateshead Millennium Bridge, UK: fabrication, assembly and erection
Civil Engineering Innovation (January,2008)
Gateshead Millennium Bridge, UK: fabrication, assembly and erection
Proceedings of the Institution of Civil Engineers - Bridge Engineering (March,2003)
Eight footbridges in the Rembrandt Park in Amsterdam
Proceedings of the Institution of Civil Engineers - Bridge Engineering (June,2006)
A-frame rocker bearing replacement at Humber Bridge, UK
Proceedings of the Institution of Civil Engineers - Civil Engineering (April,2016)
Related Chapters
The Self of the Quantified Self
Digital Health and the Gamification of Life: How Apps Can Promote a Positive Medicalization
The Positive Medicalization: Digital Meditation
Digital Health and the Gamification of Life: How Apps Can Promote a Positive Medicalization
Updating the Programme
NEC4: Effective Preparation and Management of the Construction Programme
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.