Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Issue Section
Date
Availability
1-2 of 2
Keywords: public–private partnerships
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Planning and design of the Gordie Howe International Bridge, North America
Available to PurchaseLeslie A. Martin, BSc, MEng, PEng, CEng, MICE, Zaher Yousif, MSc, PEng, Bruce L. Campbell, MASc, PE, Martin Furrer, Dipl Ing ETH, PE, SE, Matt Chynoweth, BSc, MSc, PE
Proceedings of the Institution of Civil Engineers - Bridge Engineering (2023) 176 (4): 233–249.
Published: 16 January 2023
... with Interstate-75 in Detroit. The project was procured as a public–private partnership that allowed the proponents to propose either a suspension or cable-stayed bridge, with the ultimate selection creating the longest cable-stayed bridge in North America. The paper outlines the need for the new border crossing...
Journal Articles
The new Samuel De Champlain Bridge, Canada
Available to Purchase
Proceedings of the Institution of Civil Engineers - Bridge Engineering (2023) 176 (4): 294–303.
Published: 11 November 2022
... of three independent structures: the 529 m long, asymmetric cable-stayed bridge (which features a single 169 m high tower), the 762 m long east approach and the 2044 m long west approach. The owner used a public–private partnership procurement model and the project was delivered using the design–build...
