Flood engineering in Britain is evolving from traditional approaches based on design standards to the development of risk-based decision-making, which involves taking account of a range of loads, defence system responses and impacts of flooding. Adopting such a ‘whole systems’ approach enables combinations of structural and non-structural approaches to be assessed and compared so resources can be targeted to best effect. Building on methods and know-how already in widespread use in river and coastal engineering, risk-analysis techniques are now being adopted in all areas—from high-level planning based on outline analysis to detailed designs using high-resolution simulation models. This paper explores some of the new techniques of this emerging approach to flood risk management.
Article navigation
May 2002
Research Article|
May 01 2002
Towards risk-based flood hazard management in the UK
P. B. Sayers;
P. B. Sayers
Head of the Engineers Systems and Management at HR Wallingford
Search for other works by this author on:
J. W. Hall;
J. W. Hall
Civil engineering lecturer at the University of Bristol and Royal Academy of Engineering PostDoctoral Research Fellow
Search for other works by this author on:
I. C. Meadowcroft
I. C. Meadowcroft
Risk analyst at the Environment Agency's National Centre for Risk Analysis and Options Appraisal
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1751-7672
Print ISSN: 0965-089X
© 2002 Thomas Telford Ltd
2002
Proceedings of the Institution of Civil Engineers - Civil Engineering (2002) 150 (5): 36–42.
Citation
Sayers PB, Hall JW, Meadowcroft IC (2002), "Towards risk-based flood hazard management in the UK". Proceedings of the Institution of Civil Engineers - Civil Engineering, Vol. 150 No. 5 pp. 36–42, doi: https://doi.org/10.1680/cien.2002.150.5.36
Download citation file:
New and popular articles
Suggested Reading
Cambridge Handbook of Organizational Project Management
International Journal of Managing Projects in Business (March,2018)
Management – How to Do it
The Electronic Library (August,2000)
Prioritizing decision criteria of flexible manufacturing systems using fuzzy TOPSIS
Journal of Manufacturing Technology Management (September,2017)
Civil engineering career management—the unwritten rules
Civil Engineering Innovation (March,2007)
The Gower Handbook of Management (4th ed.)
Library Management (June,1999)
Related Chapters
Chapter 5 The different phases in construction – design in health and safety to the project life cycle
ICE manual of health and safety in construction
Chapter 6 Establishing operational control processes
ICE manual of health and safety in construction
Chapter 7 Occupational health and safety management systems
ICE manual of health and safety in construction
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.