Creating Westminster station on the Jubilee Line Extension involved construction of the deepest box excavation in London and complete renewal of an operational Underground station with only minor disruptions to service. The task was further complicated by the need to provide foundations for a New Parliamentary Building above the station, which required lowering the District and Circle Line tracks by 300 mm. The control of ground movements was also of paramount importance since one of the world's most famous landmarks—Big Ben clock tower—is within 30 m of the 39 m deep station.
Keywords:
JUBILEE LINE,
EXTENSIONS,
STATIONS,
DESIGN,
CONSTRUCTION,
RAILWAYS,
UNDERGROUND,
CITIES,
TRANSPORT,
BOX,
EXCAVATIONS,
DEEP,
DISTRICT LINE,
RENEWAL,
FOUNDATIONS,
BUILDINGS,
NEW,
PARLIAMENTARY,
LOWERING,
TRACK,
CONTROL,
GROUND,
MOVEMENT,
TOWERS,
ALIGNMENT,
INTERCHANGES,
TICKET HALLS,
SETTLEMENT,
ESCALATORS,
PLATFORMS,
TUNNELS,
TENDERS,
ARCHITECTS,
CONTRACTORS,
JOINT VENTURES,
GEOTECHNICS,
PILES,
CLAYS,
LONDON CLAY,
WOOLWICH BEDS,
READING BEDS,
SAND,
THANET SAND,
CHALK,
EARTH,
PRESSURE,
SOILS,
STRUTS,
SLABS,
DEMOLITION
This content is only available via PDF.
© 1999 Thomas Telford Ltd
1999
You do not currently have access to this content.