Taming the mighty 6300 km long Yangtze river in south China was never going to be easy. Its history is littered with catastrophic flooding events that have destroyed lives and livelihoods and caused untold economic loss. The proposal to build what will still be the world's largest flood-control dam at the Three Gorges site in the river's mid-section was put forward as long ago as 1919. Wars and revolutions delayed the start until 1993 and completion is not now scheduled until 2009. This paper describes the planning and design of the £15 billion project and reports on construction progress to date. It highlights in particular the difficulties experienced in assessing the scheme's benefits against its costs—not least the need to relocate and re-skill over one million people.
Article navigation
February 2001
Research Article|
February 01 2001
The Three Gorges project on the Yangtze river in China
R. Freer, FICE
R. Freer, FICE
Former member of the ICE energy board and the ICE research and innovation committee. He has worked on hydroelectric schemes in many parts of the world
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1751-7672
Print ISSN: 0965-089X
© 2001 Thomas Telford Ltd
2001
Proceedings of the Institution of Civil Engineers - Civil Engineering (2001) 144 (1): 20–28.
Citation
Freer R (2001), "The Three Gorges project on the Yangtze river in China". Proceedings of the Institution of Civil Engineers - Civil Engineering, Vol. 144 No. 1 pp. 20–28, doi: https://doi.org/10.1680/cien.2001.144.1.20
Download citation file:
New and popular articles
Suggested Reading
Briefing: The ICOLD 2025 pre-study tour to the Yangyze River and Three Gorges Dam, China
Dams and Reservoirs (February,2026)
Yangtze River: China's golden waterway
Proceedings of the Institution of Civil Engineers - Civil Engineering (May,2010)
Morphological evolution of mid-channel bars in the Middle Yangtze River in response to upstream damming
Proceedings of the Institution of Civil Engineers - Water Management (January,2025)
Integrated assessment of slope stability considering the combined effect of reservoir water and bridge loads: a case study in TGR
Engineering Computations (May,2026)
Related Chapters
CONSTRUCTION PERSPECTIVES OF YANGTZE RIVER BRIDGES IN JIANGSU PROVINCE
Proceedings of the 3rd International Conference on Current and Future Trends in Bridge Design, Construction and Maintenance
Artificial ground freezing in cross passage construction for the Yangtze
River Tunnel of Wuhan Metro Line 2
Geotechnical Engineering for Infrastructure and Development: XVI European Conference on Soil Mechanics and Geotechnical Engineering
The geological setting of Durham Cathedral
Engineering a cathedral: Proceedings of the conference Engineering a cathedral held at Durham Cathedral on 9–11 September 1993 as part of the 900th anniversary celebrations of Durham Cathedral
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.