Skip to Main Content
Article navigation

The replacement of a strategic bridge at a remote, environmentally sensitive location on the UK's main west-coast railway in just five days required a tremendous amount of advance planning. The 135 year old Float viaduct crossing the upper reaches of the River Clyde needed to be replaced as part of Railtrack's upgrade of the busy route to suit 200 km/h electric trains. Working under a fixed-price design-and-construct contract, Carillion and Scott Wilson opted to move both the old bridge deck out and the new bridge deck in by lifting rather than sliding. Apart from the first span initially refusing to move, the meticulously planned project went without a hitch and was completed well within the five-day track possession.

You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.
Pay-Per-View Access
$39.00
Rental

or Create an Account

Close Modal
Close Modal