This paper describes post-tensioned timber alternative designs for a six-storey office building in New Zealand. The building has long-span timber–concrete composite floors supported on laminated veneer lumber beams, columns and walls. Lateral loads are resisted with moment-resisting post-tensioned timber frames in one direction and post-tensioned cantilever timber walls in the other direction. This paper compares the time and cost of timber construction with the concrete building actually being constructed. Construction times of the timber and concrete buildings are found to be almost identical. The cost of the timber alternative is approximately 6% more than concrete or steel designs. This paper demonstrates the opportunity for post-tensioned timber to compete with concrete and steel for multi-storey long-span office buildings, providing a more sustainable alternative.
Article navigation
November 2009
Research Article|
November 01 2009
Construction time and cost for post-tensioned timber buildings
T. Smith, MEng;
T. Smith, MEng
1
Research student, University of Canterbury
New Zealand
Search for other works by this author on:
M. Fragiacomo, PhD;
M. Fragiacomo, PhD
2
Associate Professor, University of Sassari
Italy
Search for other works by this author on:
S. Pampanin, PhD;
S. Pampanin, PhD
3
Associate Professor, University of Canterbury
New Zealand
Search for other works by this author on:
A. H. Buchanan, MS, PhD, FIPENZ
A. H. Buchanan, MS, PhD, FIPENZ
4
Professor, University of Canterbury
New Zealand
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
April 24 2009
Accepted:
July 13 2009
Online ISSN: 1747-6518
Print ISSN: 1747-650X
© 2009 The authors and the Institution of Civil Engineers
2009
Proceedings of the Institution of Civil Engineers - Construction Materials (2009) 162 (4): 141–149.
Article history
Received:
April 24 2009
Accepted:
July 13 2009
Citation
Smith T, Fragiacomo M, Pampanin S, Buchanan AH (2009), "Construction time and cost for post-tensioned timber buildings". Proceedings of the Institution of Civil Engineers - Construction Materials, Vol. 162 No. 4 pp. 141–149, doi: https://doi.org/10.1680/coma.2009.162.4.141
Download citation file:
New and popular articles
Suggested Reading
Performance of helically shaped metal fasteners in timber
Proceedings of the Institution of Civil Engineers - Construction Materials (May,2006)
Structural development and testing of a prototype house using timber and straw bales
Proceedings of the Institution of Civil Engineers - Structures and Buildings (January,2015)
Crane erection of timber-trussed rafter roofs
Proceedings of the Institution of Civil Engineers - Engineering Sustainability (June,2004)
Briefing: Dowel fasteners: a simple design method
Proceedings of the Institution of Civil Engineers - Structures and Buildings (October,2012)
Briefing: Stress lamination: utilising low-grade timber in construction
Proceedings of the Institution of Civil Engineers - Construction Materials (February,2006)
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.