Because of its susceptibility to self-desiccation, high-performence concrete requires additional curing: generally a 7-day wet curing period is specified which is not an easy task to perform, especially in the field. The purpose of this study was to determine whether the 7 days' wet curing required by the Ministry of Transportation of Ontario for all high-performance concrete structures is necessary to ensure optimum durability. Ordinary Portland cement concrete and two high-performance concretes (one with slag and one with fly ash) were tested. The concrete specimens were cast in a heated enclosure and covered with wet burlap and plastic. They were demoulded after 24 h. Thereafter, one-third of the specimens were wet cured for an additional 24 h, one-third for an additional 2 days and the final third for an additional 6 days; giving total wet curing periods of 2, 3 and 7 days respectively. After 14 days, the enclosure was dismantled and the specimens were exposed to the outdoor ambient conditions and covered with de-icing salts during the winter months. None of the data obtained over the subsequent 2 years for the internal shrinkage strain, the temperature or moisture content, shows any consistent trend with curing period.

You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.
Pay-Per-View Access
$39.00
Rental

or Create an Account

Close Modal
Close Modal