Because of its susceptibility to self-desiccation, high-performence concrete requires additional curing: generally a 7-day wet curing period is specified which is not an easy task to perform, especially in the field. The purpose of this study was to determine whether the 7 days' wet curing required by the Ministry of Transportation of Ontario for all high-performance concrete structures is necessary to ensure optimum durability. Ordinary Portland cement concrete and two high-performance concretes (one with slag and one with fly ash) were tested. The concrete specimens were cast in a heated enclosure and covered with wet burlap and plastic. They were demoulded after 24 h. Thereafter, one-third of the specimens were wet cured for an additional 24 h, one-third for an additional 2 days and the final third for an additional 6 days; giving total wet curing periods of 2, 3 and 7 days respectively. After 14 days, the enclosure was dismantled and the specimens were exposed to the outdoor ambient conditions and covered with de-icing salts during the winter months. None of the data obtained over the subsequent 2 years for the internal shrinkage strain, the temperature or moisture content, shows any consistent trend with curing period.
Article navigation
November 2010
Research Article|
November 01 2010
Curing time and behaviour of high-performance concrete Available to Purchase
A. Poursaee, PhD;
A. Poursaee, PhD
1
Department of Civil Engineering, Purdue University, West Lafayette
Indiana
USA
Search for other works by this author on:
C. M. Hansson, PhD
C. M. Hansson, PhD
2
Department of Mechanical Engineering, University of Waterloo, Waterloo
Ontario
Canada
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
May 09 2009
Accepted:
August 04 2009
Online ISSN: 1747-6518
Print ISSN: 1747-650X
© 2010 The authors and the Institution of Civil Engineers
2010
Proceedings of the Institution of Civil Engineers - Construction Materials (2010) 163 (4): 223–230.
Article history
Received:
May 09 2009
Accepted:
August 04 2009
Citation
Poursaee A, Hansson CM (2010), "Curing time and behaviour of high-performance concrete". Proceedings of the Institution of Civil Engineers - Construction Materials, Vol. 163 No. 4 pp. 223–230, doi: https://doi.org/10.1680/coma.900037
Download citation file:
Suggested Reading
Durability design of reinforced concrete structures
Proceedings of the Institution of Civil Engineers - Construction Materials (December,2011)
Briefing: Arch bridges – unlocking their potential
Proceedings of the Institution of Civil Engineers - Engineering and Computational Mechanics (July,2016)
Prediction of service life of concrete structures using corrosion rate model
Proceedings of the Institution of Civil Engineers - Structures and Buildings (February,2012)
Lucinda Jetty revisited: alkali-silica reaction and corrosion in prestressed concrete
Proceedings of the Institution of Civil Engineers - Structures and Buildings (May,2019)
Impact of repairs on embodied carbon dioxide expenditure for a reinforced-concrete quay
Proceedings of the Institution of Civil Engineers - Engineering Sustainability (January,2018)
Related Chapters
MODELS FOR ENVIRONMENTAL ACTIONS ON REINFORCED CONCRETE STRUCTURES
Repair and Renovation of Concrete Structures: Proceedings of the International Conference held at the University of Dundee, Scotland, UK on 5–6 My 2005
PERFORMANCE OF REINFORCED CONCRETE PILES EXPOSED TO MARINE ENVIRONMENT
Challenges of Concrete Construction: Volume 6, Concrete for Extreme Conditions: Proceedings of the International Conference held at the University of Dundee, Scotland, UK on 9–11 September 2002
APPLICATION OF RELIABILITY THEORY IN SERVICE LIFE PREDICTION OF INITIATION TIME
Challenges of Concrete Construction: Volume 3, Repair, Rejuvenation and Enhancement of Concrete: Proceedings of the International Seminar held at the University of Dundee, Scotland, UK on 5–6 September 2002
Recommended for you