Open figure viewer
The lower reservoir in a cascade built in the mid- to late nineteenth century was reclassified to category A. This paper discusses the modifications required to enable the spillway to pass the probable maximum flood safely. It covers flood study, physical model study, design and construction phases.
Keywords:
dams and reservoirs
© 2008 Thomas Telford Ltd
2008
You do not currently have access to this content.
