Skip to Main Content
Article navigation

The lower reservoir in a cascade built in the mid- to late nineteenth century was reclassified to category A. This paper discusses the modifications required to enable the spillway to pass the probable maximum flood safely. It covers flood study, physical model study, design and construction phases.

You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.
Pay-Per-View Access
$39.00
Rental

or Create an Account

Close Modal
Close Modal