United Utilities is one of the largest dam owners in the UK with over 150 embankment dams, typically built between the 1850s to late 1890s. The majority fall under the auspices of the 1975 Reservoir Act and undergo regular inspections by qualified supervising and inspecting engineers. These identify works required in the interest of safety. In addition United Utilities will take the opportunity to upgrade its assets to meet modern design standards and bring them in line with current standards and best practice. In order to prioritise remedial works and upgrades to comply with contemporary requirements, United Utilites has been at the forefront of the development of risk assessment techniques to manage its assets on the basis of risk assessment. This paper will describe the development and application of these techniques to assist United Utilities in rationalising its asset management Plan investment decisions. It also describes some new cost- and environmentally-efficient investigation and design approaches developed and adopted in recent years to improve these assets.
Article navigation
June 2011
Research Article|
June 01 2011
Ground risk management of a major portfolio of embankment dams in the UK Available to Purchase
Malcolm Eddleston, DipEM, PhD, CEng, FICE, CGeol, FGS;
Malcolm Eddleston, DipEM, PhD, CEng, FICE, CGeol, FGS
1
Technical Director
MWH, Birchwood, Warrington
UK
Search for other works by this author on:
Ian C. Carter, BSc (Hons), CEng, FICE, CGeol, FGS;
Ian C. Carter, BSc (Hons), CEng, FICE, CGeol, FGS
2
All Reservoirs Panel Engineer
MWH, High Wycombe
UK
Search for other works by this author on:
Keith D. Gardiner, BSc (Hons), CEng, FICE
Keith D. Gardiner, BSc (Hons), CEng, FICE
3
Regional Reservoir Safety Manager
United Utilities Water plc, Great Sankey, Warrington
UK
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1756-8404
Print ISSN: 1368-1494
ICE Publishing: All rights reserved
2011
Dams and Reservoirs (2011) 21 (2): 51–62.
Citation
Eddleston M, Carter IC, Gardiner KD (2011), "Ground risk management of a major portfolio of embankment dams in the UK". Dams and Reservoirs, Vol. 21 No. 2 pp. 51–62, doi: https://doi.org/10.1680/dare.2011.21.2.51
Download citation file:
Suggested Reading
Erratum: Observations on reservoir risk designation for the amended Reservoirs Act
Dams and Reservoirs (June,2014)
Review of publications relevant to the UK dams industry
Dams and Reservoirs (September,2009)
Report on the European working group on internal erosion, St. Petersburg
Dams and Reservoirs (September,2009)
BDS Corporate Members
Dams and Reservoirs (June,2013)
Busman's holiday – observations from a visit to Itaipu dam
Dams and Reservoirs (December,2010)
Related Chapters
Flow control failures in dam safety
Operational Safety of Dams and Reservoirs: Understanding the reliability of flow-control systems
Systems and systems engineering
Operational Safety of Dams and Reservoirs: Understanding the reliability of flow-control systems
Modelling dam and reservoir systems
Operational Safety of Dams and Reservoirs: Understanding the reliability of flow-control systems
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
