Skip to Main Content
Article navigation

A typical product design project involves a number of activities, and each activity requires human resources support. These activities and resources must be properly planned and scheduled in order to achieve optimum project time and cost. This paper proposes a process planning and scheduling (PPAS) system which is based on the concept of process planning typically used for the planning of production activities. Object technology (OT) is chosen as the platform for the development of the PPAS model for its specific characteristics such as inheritance, encapsulation, polymorphism etc. Presents the concept of the PPAS system, discusses its relationship with reference to product design, and proposes the use of object technology as a platform for building the PPAS.

You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.
Pay-Per-View Access
$41.00
Rental

or Create an Account

Close Modal
Close Modal