The concrete building products manufacturing industry supplies 2,000‐4,000 precast concrete building products to the construction industry. Owing to seasonal demand, the industry builds up stock in winter to meet the high demand in summer. As concrete products are heavy and vary in shape and size, proper stocking in terms of layout and methods of stocking of products on the yard is essential. Industrial practice suggests that stockyard space management gets less attention during strategic and budget planning as it is left to the stockyard manager. The industry experiences space congestion for both the storage and dispatch of products. During dispatch process, greater retrieval time is required, long queues of lorries (shipping vehicles) are formed and desired level of service cannot be maintained. Presents a review of stockyard operations, analysis of parameters affecting loading and dispatch process on the yard and strategies to optimise the stockyard layout. It is expected that proper layout planning will reduce the cost of delivery of products by 5‐10 per cent in the industry where profit is less than 5‐8 per cent.
Article navigation
1 December 2001
This article was originally published in
Logistics Information Management
Research Article|
December 01 2001
Stockyard layout planning and management for the precast concrete products industry Available to Purchase
Nashwan Dawood;
Nashwan Dawood
Professor of Construction Management and IT, University of Teesside, School of Science and Technology, Middlesbrough, UK
Search for other works by this author on:
Ramesh Marasini
Ramesh Marasini
Research Student, University of Teesside, School of Science and Technology, Middlesbrough, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1758-7948
Print ISSN: 0957-6053
© MCB UP Limited
2001
Logistics Information Management (2001) 14 (5-6): 328–337.
Citation
Dawood N, Marasini R (2001), "Stockyard layout planning and management for the precast concrete products industry". Logistics Information Management, Vol. 14 No. 5-6 pp. 328–337, doi: https://doi.org/10.1108/EUM0000000006245
Download citation file:
506
Views
Suggested Reading
Performance evaluation of resource allocation strategies for new product development under different workload scenarios
Journal of Modelling in Management (July,2009)
Krylov subspaces from bilinear representations of nonlinear systems
COMPEL (April,2007)
Optimisation of man‐on‐board automated storage/retrieval systems
Integrated Manufacturing Systems (April,2000)
Implementation and utilization of a decentralized storage system: costing model
International Journal of Operations & Production Management (September,1995)
Layout design in manual picking systems: a simulation approach
Integrated Manufacturing Systems (April,2000)
Related Chapters
AN ACTIVE FACILITY MANAGEMENT STRATEGY FOR CONTAINMENT OF INTERMEDIATE LEVEL WASTE USING RISK-BASED SERVICE LIFE MODELLING OF REINFORCED CONCRETE
Role of Concrete in Nuclear Facilities
Business Process Management Approach in the Hospitality Industry
Sustainable Hospitality Management: Designing Meaningful Encounters With Talent and Technology
KEY FEATURES IN VIEW OF MODELLING THE PERMEABILITY OF CONCRETE
Cement Combinations for Durable Concrete: Proceedings of the International Conference held at the University of Dundee, Scotland, UK on 5–7 July 2005
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
