Two pilot-scale biological nutrient removal bioreactors were operated side by side under selected flow rate conditions. One reactor was operated under an integrated fixed-film activated sludge (IFAS) reactor configuration, and the second reactor was operated under a conventional activated sludge reactor configuration. The relatively high dissolved oxygen (DO) and low food-to-microorganism ratio created a favourable environment for the proliferation of redworm identified as Aeolosoma hemprichi in the IFAS reactor from day 116, which led to significant deterioration on ammonia removal in the IFAS reactor. The removal efficiencies of chemical oxygen demand (COD) and phosphorus were not significantly affected by the redworm bloom. Several strategies were applied to eliminate the redworms from the IFAS reactor. The most effective strategy was shutting off the DO supply in the aerobic zone and stopping the influent feed for 48 h. Finally, it took about 1·5 months for the IFAS reactor to recover from performing the worm elimination strategy.
Article navigation
22 March 2019
Research Article|
October 03 2018
Redworm elimination in an integrated fixed-film activated sludge reactor
Shengnan Xu, PhD
;
Shengnan Xu, PhD
Associate Professor
Department of Civil and Environmental Engineering, College of Engineering, Shantou University, Shantou, China
Search for other works by this author on:
Kingsley Nze, MSc;
Kingsley Nze, MSc
MSc student
Department of Civil and Environmental Engineering, University of Alberta, Edmonton, AB, Canada
Search for other works by this author on:
Abdul Mohammed, MSc;
Abdul Mohammed, MSc
Senior Specialist in Wastewater Treatment
EPCOR Water Services Inc., Edmonton, AB, Canada
Search for other works by this author on:
Yang Liu, PEng, PhD
Department of Civil and Environmental Engineering, University of Alberta, Edmonton, AB, Canada
(corresponding author: yang.liu@ualberta.ca)
Search for other works by this author on:
(corresponding author: yang.liu@ualberta.ca)
Publisher: Emerald Publishing
Received:
April 25 2018
Accepted:
September 07 2018
Online ISSN: 1496-256X
Print ISSN: 1496-2551
ICE Publishing: All rights reserved
2019
Journal of Environmental Engineering and Science (2019) 14 (1): 44–53.
Article history
Received:
April 25 2018
Accepted:
September 07 2018
Citation
Xu S, Nze K, Mohammed A, Liu Y (2019), "Redworm elimination in an integrated fixed-film activated sludge reactor". Journal of Environmental Engineering and Science, Vol. 14 No. 1 pp. 44–53, doi: https://doi.org/10.1680/jenes.18.00011
Download citation file:
New and popular articles
Suggested Reading
Defluoridation of water using a new biosorbent developed from Ficus glomerata Roxb. bark
Proceedings of the Institution of Civil Engineers - Water Management (June,2018)
Water management at BedZED: some lessons
Proceedings of the Institution of Civil Engineers - Engineering Sustainability (June,2008)
Multi-stage filtration for developing world surface water treatment
Proceedings of the Institution of Civil Engineers - Water Management (September,2004)
Pressure-dependent network water quality modelling
Proceedings of the Institution of Civil Engineers - Water Management (December,2013)
A physico-chemical water treatment system for relief agencies
Proceedings of the Institution of Civil Engineers - Water Management (December,2004)
Related Chapters
Pedestrian Safety and Public Health
Walking: Connecting Sustainable Transport with Health
A Sustainable Development Agenda for the UK National Health Service (NHS): An Organizational Learning Model for Defining and Supporting Goals
Ecological Health: Society, Ecology and Health
The Lived Experiences of Daughters of Women with Breast Cancer
Family and Health: Evolving Needs, Responsibilities, and Experiences
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.