Brougham Castle Bridge is a three-span masonry arch highway bridge that has suffered significant scour damage to foundations and substructure with referred damage through the superstructure. This paper presents an engineer’s account of the appraisal, investigation, assessment of structural action and the design and execution of repairs for stabilising the structure. The analytical tool employed to interpret the flow of force was a thrust-line graphical equilibrium analysis. It will be demonstrated that this analytical approach accords with the observed structural pathology, thus giving a clear understanding as to where the loads are going, that they may be effectively grappled with. Through thrust-line analysis, continued stability could be demonstrated despite substantial changes in the foundation conditions. It seems fitting that this efficient, robust and confidence-building tool is the same used by the engineers who originally designed many of these bridges. Using this ‘historical approach’, a successful intervention was executed; initially emergency stabilisation work to save the bridge from collapse and latterly permanent rehabilitation works to bring the bridge back into service in advance of the upcoming winter floods.
Article navigation
February 2019
Editors
Research Article|
February 01 2019
Rehabilitation of Brougham Castle Bridge, UK
David Wiggins, BSc(Hons), PhD, IEng, MICE;
Curtins, Kendal, UK
(corresponding author: david.wiggins@curtins.com)
Search for other works by this author on:
Kiera Mudd, MEng(Hons);
Kiera Mudd, MEng(Hons)
Engineer
Curtins, Leeds, UK
Search for other works by this author on:
Matthew Healey, HNC, ONC
Matthew Healey, HNC, ONC
Contracts Director
Civil Engineering, Metcalfe Plant Hire Ltd, Penrith, UK
Search for other works by this author on:
(corresponding author: david.wiggins@curtins.com)
Publisher: Emerald Publishing
Received:
August 17 2018
Accepted:
October 01 2018
Online ISSN: 1757-9449
Print ISSN: 1757-9430
ICE Publishing: All rights reserved
2019
Proceedings of the Institution of Civil Engineers - Engineering History and Heritage (2019) 172 (1): 7–18.
Article history
Received:
August 17 2018
Accepted:
October 01 2018
Citation
Wiggins D, Mudd K, Healey M (2019), "Rehabilitation of Brougham Castle Bridge, UK". Proceedings of the Institution of Civil Engineers - Engineering History and Heritage, Vol. 172 No. 1 pp. 7–18, doi: https://doi.org/10.1680/jenhh.18.00027
Download citation file:
New and popular articles
Suggested Reading
Nineteenth-century cast-iron parapet of Blackfriars Road Bridge, London, UK
Proceedings of the Institution of Civil Engineers - Engineering History and Heritage (November,2018)
High Level Bridge: engineering successful heritage solutions
Proceedings of the Institution of Civil Engineers - Engineering History and Heritage (August,2009)
Winchelsea masonry arch bridge, Australia: first major maintenance
Proceedings of the Institution of Civil Engineers - Engineering History and Heritage (August,2014)
The Ordsall Chord, UK: conservation architecture and engineering – part 1: project overview
Proceedings of the Institution of Civil Engineers - Engineering History and Heritage (May,2020)
The refurbishment of Telford’s Nantwich Aqueduct, UK
Proceedings of the Institution of Civil Engineers - Engineering History and Heritage (February,2021)
Related Chapters
Nonprofit Social Responsibility and Sustainability: Engaging Urban Youth through Empowerment
Corporate Social Responsibility, Sustainability, and Ethical Public Relations: Strengthening Synergies with Human Resources
The Status of Conservation of Mangroves in the Krueng Reuleng River Area, Leupung, Aceh Besar Regency, Indonesia
Proceedings of MICoMS 2017
Driving the Great Apes to Extinction: Perspectives from Conservation Biology, Politics, and Bioethics
Biopolicy: The Life Sciences and Public Policy
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
