Skip to Main Content
Article navigation

The aims of this paper are to record how the Connaught Tunnel was surveyed, assessed and repaired by Crossrail for use for the new Elizabeth line in London, UK. The challenges and changes involved with implementing the repairs required to bring an example of Victorian engineering back into use again were based on Network Rail guidance and other current practice. The repairs will reduce future maintenance requirements, which will benefit railway operations in the future. Groundwater leakage remains within the tunnel as the cost of rectifying the leaks, if successful, would have been prohibitive. Prior to the Crossrail Act of 2008, consideration was given to the whole-life costing of reusing the tunnel as opposed to boring new tunnels, and the cost of new tunnels was considered to be higher than the costs of repairs, maintenance and ongoing drainage requirements to reuse the existing tunnel.

You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.
Pay-Per-View Access
$39.00
Rental

or Create an Account

Close Modal
Close Modal