Information used for performance measurement is very different from the kind of information used for control and monitoring. It tends to make use of aggregate data covering time intervals of months rather than minutes. Accuracy rather than precision is the overarching concern. Some performance indicators can be derived from building control data. Information such as conversion efficiencies of plant and energy efficiency of buildings can be calculated from monitored data. For the purposes of performance assessment, however, such data tend to be limited in scope. The advent of embedded web servers promises to change this situation radically. Not just data, but transformed information, can be generated by the coexistence of device‐people networks. Effectiveness becomes a measurable concept as web enabled devices create information designed for human interpretation rather than the interpretation of other computers.
Article navigation
1 April 2002
Research Article|
April 01 2002
Automated information capture in performance measurement Available to Purchase
Edward Finch
Edward Finch
Lecturer, School of Construction Management and Engineering, The University of Reading, Whiteknights, PO Box 219, Reading RG6 6AW, UK; Tel: +44 (0)118 931 8201; Fax: +44 (0)118 931 3856; E‐mail: e.f.finch@rdg.ac.uk
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1741-0983
Print ISSN: 1472-5967
© MCB UP Limited
2002
Journal of Facilities Management (2002) 1 (2): 188–195.
Citation
Finch E (2002), "Automated information capture in performance measurement". Journal of Facilities Management, Vol. 1 No. 2 pp. 188–195, doi: https://doi.org/10.1108/14725960310807935
Download citation file:
Suggested Reading
iSYSTEM and PHYTEC launch combination rapid development kit
Microelectronics International (August,2004)
The industrial application of personal computers
Assembly Automation (December,1999)
Embedded systems new sector at Electronica 2000
Microelectronics International (December,2000)
Ground zero zero: flying into the next millennium with embedded systems
Aircraft Engineering and Aerospace Technology: An International Journal (August,1998)
Selecting the best contractor to get performance: On time, on budget, meeting quality expectations
Journal of Facilities Management (April,2002)
Related Chapters
Achieving best value and minimising disruption through bridge management plans
Bridge design, construction and maintenance: Proceedings of the two day international conference organised by the Institution of Civil Engineers and held in Beijing on 17–18 September 2007
Performance measures for highway structures
Bridge Management 5: Inspection, maintenance, assessment and repair: Proceedings of the 5th International Conference on Bridge Management, organized by the University of Surrey, 11–13 April 2005
How Businesses Benefit from Intelligent Buildings
Intelligent Buildings and Infrastructure with Sustainable and Social Values
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
