One of the major objectives of facility owners is to get the ‘best value’ in construction, renovation or maintenance of facilities. Owners are reluctant to pay more for best value if they do not understand what the value is. Research now proposes that the use of best value procurement can actually reduce the first costs of delivering the construction. The research looks at the transaction costs or the first costs of construction. The research uses the procurement of roofing in the State of Hawaii because of the availability of data on both the low‐bid and best value procurements. The State of Hawaii used transaction cost analysis to identify the cost of best value construction. The costs considered were planning and programming, design, procurement, construction management and inspection costs. Owing to the number of projects and the access to budget figures, construction cost figures, design costs and construction times, the State was able to identify the relative transaction costs and performance for both processes. The first costs or transaction costs of the best value procurements were lower than the transaction costs of the traditional design‐bid‐build costs. The actual performances of the roofing systems procured, which included warranty period, performance of the contractor and performance of the roofing systems, were far superior. The result was an increase in value for a lower cost.
Article navigation
1 July 2003
Conceptual Paper|
July 01 2003
The cost of ‘best value’ construction
Dean Kashiwagi;
Dean Kashiwagi
Director, Performance Based Studies Research Group, Del E. Webb School of Construction, Arizona State University, PO Box 870204, Tempe, AZ 85287‐0204, USA; Tel: +1 480 965 4273; Fax: +1 480 965 4371; E‐mail: dean.kashiwagi@asu.edu; Website: www.pbsrg.com
Search for other works by this author on:
John Savicky
John Savicky
Project Manager, Performance Based Studies Research Group, Del E. Webb School of Construction, Arizona State University, PO Box 870204, Tempe, AZ 85287‐0204, USA
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1741-0983
Print ISSN: 1472-5967
© MCB UP Limited
2003
Journal of Facilities Management (2003) 2 (3): 285–297.
Citation
Kashiwagi D, Savicky J (2003), "The cost of ‘best value’ construction". Journal of Facilities Management, Vol. 2 No. 3 pp. 285–297, doi: https://doi.org/10.1108/14725960410808267
Download citation file:
New and popular articles
Suggested Reading
Choice of foreign licensees: information and communication technology firms
Industrial Management & Data Systems (September,2013)
Procurement contract management in the local government authorities (LGAs) in Tanzania: A transaction cost approach
International Journal of Public Sector Management (August,2016)
Business relationship framework in Indonesia: relationship marketing vs transaction cost
Journal of Asia Business Studies (January,2016)
Interactions among antecedents of project outsourcing strategies: evidence from Chinese construction firms
Engineering, Construction and Architectural Management (August,2022)
Influence of cooperative period of municipal PPPs on transaction cost – a case study
Engineering, Construction and Architectural Management (August,2020)
Related Chapters
Economic Partnership Agreement between Mexico and Japan and Its Impact on Foreign Direct Investment – A Strategic Analysis
The Gains and Pains of Financial Integration and Trade Liberalization: Lessons from Emerging Economies
Optimal Trading and Tax Option Value of Defaultable Bonds with Asymmetric Capital Gain Taxes
Advances in Pacific Basin Business, Economics and Finance
In Pursuit of a Technical Need or Political Compromise: Reforms of Public Financial Management Practices in Ghana's Health Sector
Finance and Development in Africa
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.